Laserfiche WebLink
LEAK RESPONSE PLAN <br /> 6 <br /> 0 ODUCTION <br /> IT IS THE PURPOSE OF THIS SECTION TO ESTABLISH BASIC GUIDELINES AND PROCEDURES FOR USE BY THE EQUILON <br /> ENTERPRISES, LLC. FOR THE HANDLING OF PRODUCT SPILLS/LEAKS WHICH MAY OCCUR AT EQUILON FACILITIES. <br /> DESIGN AND INSTALLATION IMPROVEMENTS ARE CONTINUOUSLY BEING EVALUATED AND IMPLEMENTED IN ORDER <br /> TO REDUCE, AND ELIMINATE, THE POTENTIAL FOR PRODUCT LEAKAGE. <br /> RESPONSIBLE EQUILON PERSONNEL <br /> NAME TITLE PHONE <br /> Suresh Narasimhan Dealer Day: 209-823-5265 <br /> 24hr: 510-651-4543 <br /> Aura Mattis SH&E Coordinator Office: 510-335-5026 <br /> Pager: 800-656-9726 <br /> Alex Perez Environmental Engineer Office: 510-335-5027 <br /> Pager: 800-462-7512 <br /> Brett Hovland Project Engineer Office: 510-335-5032 <br /> Pager: 510-840-2426 <br /> RESPONSIBLE CONTRACTOR <br /> 0 Services <br /> 6 N. Hazel #108 <br /> Fresno CA 93722 <br /> 800-552-7503 <br /> LEAK VERIFICATION <br /> WHEN A SERVICE STATION PRODUCT LOSS IS SUSPECTED OR REPORTED, THE FOLLOWING LEAK VERIFICATION <br /> PROCEDURES WILL APPLY: <br /> 1. THE EQUILON ENGINEER WILL ARRANGE FOR THE EQUILON TERRITORY MANAGER TO IMMEDIATELY <br /> (THE SAME DAY)VISIT THE STATION TO REVIEW THE DEALER'S PHYSICAL CONTROL OF PRODUCTS AND <br /> INVENTORY RECORDS. <br /> 2. AT THE SAME TIME, THE ENGINEER WILL ORDER A PUMP/DISPENSER CALIBRATION, ASSURE METERS <br /> ARE SEALED, INSPECT ACCESSIBLE POTENTIAL LEAK SOURCES, AND CHECK LEAK DETECTOR <br /> OPERATION (ON REMOTE SYSTEMS). <br /> 3. ALSO, THE ENGINEER SHALL START MAINTAINING A PRODUCT LOSS LOG AS WELL AS A RECORD OF <br /> SIGNIFICANT DAILY LEAK RELATED ACTIVITIES. <br /> 4. IF THE ABOVE INVESTIGATIONS PROVE INCONCLUSIVE, THE TERRITORY MANAGER SHOULD <br /> IMMEDIATELY BEGIN A DAILY INVENTORY LOG (EXHIBIT B), WHICH WOULD BE MAINTAINED FOR A <br /> MINIMUM PERIOD OF 48 HOURS AND A MAXIMUM OF 7 DAYS, FOR SUBSTANTIATION OF A SUSPECTED <br /> LEAK. DEPENDING ON THE CIRCUMSTANCES (POTENTIAL HAZARDOUS CONDITION, ETC.), IT MAY BE <br /> NECESSARY TO TAKE ADDITIONAL LEAK RESPONSE ACTION DURING THE PERIOD OF INVENTORY. <br /> 05. IF PRODUCT LOSSES ARE VERIFIED, PRODUCT LINES AND/OR TANKS MAY REQUIRE TESTING TO <br /> DETERMINE THE LEAK SOURCE. <br />