Laserfiche WebLink
1 <br /> . 1 <br /> A. PRODUCT LINES MAY BE TESTED USING AIR PRESSURE (APPROXIMATELY SO FSI) OR A Equ►on <br /> APPROVED LINE TESTING SYSTEM (E.G., KENT-MOORS). SHOULD THE LINE TESTS INDICATE <br /> LEAKING LINES, THEY SHALL BE REPAIRED OR REPLACED AND RETESTED TO ASSURE THE LEAK <br /> HAS BEEN STOPPED. IN ADDITION,A PRODUCT LOG INVENTORY CHECK SHOULD BE MAINTAINED <br /> FOR A PERIOD OF 7 DAYS AFTER THE LINE REPAIRS TO ASSURE THERE ARE NO OTHER LEAKS IN <br /> THE SYSTEM. <br /> B. SHOULD THE TEST INDICATE THE LINES ARE NOT LEAKING OR IF A SHORTAGE CONTINUES AFTER <br /> THE LINES HAVE BEEN REPAIRED, THE UNDERGROUND TANK(S) SHALL BE TESTED BY A <br /> PRECISION OR OTHER APPROVED PROCEDURE. (SEE N.F.P.A.329). <br /> NOTE_ : LOCAL FIRE CODES AND ORDINANCES MAY DICTATE THE APPROPRIATE TESTING PROCEDURES FOR USE <br /> ON UNDERGROUND TANKS. AIR TESTS OF UNDERGROUND TANKS ARE NOT RECOGNIZED AS <br /> CONCLUSIVE, ARE DEEMED UNSAFE BY MANY FIRE PREVENTION AGENCIES, AND SHOULD NOT BE USED. <br /> IF THE TANK TEST INDICATES ONE OR MORE TANK LEAKS, REPAIR OR REPLACEMENT WILL BE <br /> COMPLETED. <br /> CORRECTIVE ACTION <br /> 1. THE EQUILON ENGINEERING STAFF SHALL TAKE IMMEDIATE ACTION TO STOP, CONTAIN, AND SHALL <br /> TAKE IMMEDIATE DECISIVE ACTION TO RELIEVE THE THREAT OF PUBLIC HEALTH AND SAFETY <br /> HAZARDS, OR PROPERTY DAMAGE. <br /> 2. IT MAY BE APPROPRIATE TO OBTAIN SAMPLES OF THE RELEASED PRODUCT FOR TESTING AND <br /> IDENTIFICATION BY EQUILON LABORATORY. <br /> 3. OBSERVATION WELLS WILL ONLY BE INSTALLED WITH HEAD OFFICE, MARKETING ENGINEERING, <br /> ENVIRONMENTAL GUIDANCE. IF LOCAL AUTHORITIES AND/OR CONDITIONS DEMAND IMMEDIATE <br /> INSTALLATION, THEN INSTALL THE TEST WELLS IN ACCORDANCE WITH STANDARDS SHOWN FOR <br /> MINIMUM FOUR INCH PVC PIPE WITH INSTALLATION. <br /> IF FORCED, BY SITUATION, TO INSTALL OBSERVATION WELLS OFF SITE ON PUBLIC PROPERTY, <br /> ACQUIRE LOCAL AUTHORITY APPROVAL OR WRITTEN ORDER TO PERFORM THE WORK. <br /> 4. OBSERVA'T'ION WELL INSTALLATION STANDARDS (SEE OBSERVATION WELL DETAIL ATTACHED). <br /> A. INSTALL OBSERVATION WELLS IN LOCATIONS SPECIFIED AND/OR APPROVED BY HEAD OFFICE, <br /> MARKETING ENGINEERING, ENVIRONMENTAL. <br /> B. DRILL (AUGER) A MINIMUM 12-INCH DIAMETER HOLE TO A DEPTH OF AT LEAST 5 FEET BELOW <br /> THE MINIMUM WATER TABLE. <br /> C. INTO THE HOLE, INSTALL 4-INCH OR 6-INCH DIAMETER SCHEDULE 40 SLOTTED AND BLANK PVC <br /> PIPE, WITH PIPE SIZE DEPENDENT UPON THE SITE'S GEOLOGY AND LOCAL REGULATIONS. <br /> SLOTTED PIPE SHALL HAVE FACTORY CUT TWENTY THOUSANDTHS (.020) INCH SLOTS. <br /> D. USE SLOTTED PIPE FROM THE BOTTOM OF THE WELL HOLE TO APPROXIMATELY 3 FEET ABOVE <br /> THE MAXIMUM GROUNDWATER TABLE, CONSIDERING WATER TABLE FLUCTUATION. THE <br /> SLOTTED PIPE SHALL BE CAPPED AT THE BOTTOM. <br /> E. THE BLANK PIPE SECTION ATTACHED TO THE TOP OF THE SLOTTED PIPE AND EXTENDS UPWARD <br /> TO JUST BELOW GRADE ELEVATION. AVOID USING GLUE TO COUPLE THE PIPE SECTIONS; <br /> RATHER, USE THREADED PVC PIPE OR OTHER COUPLING METHODS WHENEVER POSSIBLE. A <br /> LOCKABLE CAP SHALL BE INSTALLED ON TOP OF THE BLANK PIPE. <br />