Laserfiche WebLink
SWRCB, January 2002 <br />5. SECONDARY PIPE TESTING • <br />Page 3 . <br />Test Method Developed By: F% Tank Manufacturer ❑ Industry Standard ❑ Professional Engineer <br />Other (Specify) <br />Test Method Used: Pressure ❑ Vacuum Hydrostatic <br />Other (Spec) <br />Test Equipment Used: <br />Piping Rm # 3 UNL REG Piping Ron # 2 PLU PLUS <br />Equipment Resolution: <br />Piping Run # 1 SUP SUP <br />Piping Run # <br />Piping Material: <br />fiberglass <br />fiberglass <br />fiberglass <br />Piping Manufacturer: <br />ameron <br />ameron <br />ameron <br />Piping Diameter: <br />311 <br />3-- <br />311 <br />Length of Piping Run: <br />180' <br />180' <br />180' <br />Product Stored: <br />UNLEADED <br />PLUS <br />SUPREME <br />Method and location of <br />piping -run isolation: <br />UNLEADED <br />PLUS <br />SUPREME <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />5min <br />5min <br />5min <br />Test Start Time: <br />9:52 <br />9:55 <br />9:48 <br />Initial Reading (PI ): <br />3psi <br />3psi <br />3psi <br />Test End Time: <br />10 :52 <br />10:55 <br />10:48 <br />Final Reading (RF ): <br />3psi <br />3psi <br />3psi <br />Test Duration: <br />lhr <br />lhr <br />lhr <br />Change in Reading (RF - R1 ): <br />0 <br />0 <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />o <br />0 <br />0 <br />Test Result: <br />Pass F-1 Fail <br />E Pass <br />El <br />Fail <br />EPass <br />0 <br />Fail <br />El <br />Pass <br />El <br />Fail <br />Comments - (include information on repairs made prior to testing, and recommended follow-upJbr failed tests) <br />ALL THREE LINES NEEDED NEW BOOTS 3 BLUE LINE BOOTS WERE PUT ON. <br />