Laserfiche WebLink
SWRCB„ January 2002 • • Page 4 - <br />6. PIPING SUMP TESTING <br />Test Method Developed By: ❑ Sump Manufacturer Industry Standard �x Professional Engineer <br />Other (Specify) <br />Test Method Used: ❑ Pressure Vacuum Hydrostatic <br />El Other (Specify) <br />Test Equipment Used: vplt <br />Sump# 3 UNL Sump# 2 PLU <br />Equipment Resolution: <br />Sump# 1 SUP <br />48" <br />Sump# <br />Sump Diameter: <br />48" <br />48" <br />Sump Depth: <br />69" <br />69" <br />69" <br />Sump Material: <br />fiberglass <br />fiberglass <br />fiberglass <br />Height from Tank Top to Top of <br />Highest Piping Pentration: <br />1311 <br />1311 <br />1311 <br />Height from Tank Top to Lowest <br />Electrical Pentration: <br />21" <br />21" <br />21" <br />Condition of sump prior to testing: <br />good <br />good <br />'good <br />Portion of Sump Tested: 1 <br />15 " <br />1511 <br />15" <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />product and water)?* <br />flYes �Na❑N <br />OYes �Na❑N <br />Yes �Na❑N <br />Yes �No❑N <br />Turbine shutdown response time: <br />2-5sec <br />2-5sec <br />2-5sec <br />Is system programmed for fail-safe <br />shutdown?* <br />x ❑ Yes N N <br />❑ � <br />❑ ^ <br />x ❑ Yes NOUN <br />x ❑ Yes N <br />❑ � <br />R ❑ Yes No <br />❑ <br />Was fail-safe verified to be <br />operational?* <br />MYesF]No❑N <br />EYes❑No�N <br />MYesMNo�N <br />EYes �No�I <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test: <br />5min <br />5min <br />5min <br />Test Start Time: <br />11:10 <br />10:10 <br />10:22 <br />Initial Reading (RI ): <br />5.320 <br />4.567 <br />7.418 <br />Test End Time: <br />11:40 <br />10:40 <br />10:52 <br />Final Reading (RF ): <br />5.320 <br />4.567 <br />7.236 <br />Test Duration: <br />30MIN <br />30MIN <br />30MIN <br />Change in Reading (R F - RI ): <br />.000GPH <br />.000GPH <br />.01GPH <br />Puss/Fail Threshold or Criteria: <br />. 05GPH <br />. 05GPH <br />. 05GPH <br />Test Result: <br />M Pass 0 <br />Fail <br />M Pass F__1'. <br />Fail <br />X❑ Pass F] Fail <br />D Pass ❑ Fail <br />Was sensor removed for testing? <br />R <br />Yes <br />N <br />NA <br />X <br />Yes <br />N <br />NA <br />EYesoNoL]NA <br />Yes <br />No <br />Was sensor properly replaced and <br />verified functional after testing? <br />R Ye N NA <br />❑ � <br />R Ye N NA <br />❑ � � <br />R Ye N NA <br />❑ � � <br />❑ ❑ �* <br />Yes N <br />Comments - (include information on repairs made prior to testing, and recommended follow-up forfailed tests) <br />1 If the entire depth of the sump is not tested, specify how much was tested. If the answer to any -917 the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />