My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2005 - 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
334
>
2300 - Underground Storage Tank Program
>
PR0231665
>
COMPLIANCE INFO 2005 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2022 11:40:43 AM
Creation date
11/7/2018 4:53:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005 - 2015
RECORD_ID
PR0231665
PE
2361
FACILITY_ID
FA0003714
FACILITY_NAME
LACHHAR CHEVRON*
STREET_NUMBER
334
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
26115041
CURRENT_STATUS
02
SITE_LOCATION
334 E MAIN ST
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\M\MAIN\334\PR0231665\COMPLIANCE INFO 2005 - 2015.PDF
QuestysFileName
COMPLIANCE INFO 2005 - 2015
QuestysRecordDate
3/7/2017 12:38:04 AM
QuestysRecordID
3348427
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB„January 2002 Page 5. <br />7. UNDER -DISPENSER CONTAINMENT (UD(f ESTING <br />Test Method Developed By: ❑ UDC Manufacturer ❑ Industry Standard Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ❑ Pressure ❑ Vacuum X❑ Hydrostatic <br />D Other (Specify) <br />Test Equipment Used: VPLT <br />UDC# 1/2 UDC# 3/4 <br />UDC Manufacturer: C. a. C. S. <br />Equipment Resolution: <br />UDC# 5/6 <br />UDC# 7/8 <br />C. S. <br />C. S. <br />UDC Material: <br />fiberglass <br />fiberglass <br />fiberglass <br />fiberglass <br />UDC Depth: <br />30” <br />30" <br />30" <br />30" <br />Height from UDC Top to Top of <br />Highest Piping Pentration: <br />9„ <br />9„ <br />9„ <br />9,. <br />Height from UDCTop to Lowest <br />Electrical Pentration: <br />711 <br />7" <br />7 „ <br />7 <br />Condition of UDC prior to testing: <br />good <br />good <br />good <br />good <br />Portion of UDC Tested: t <br />11" <br />11" <br />11" <br />11" <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />product and water)?* <br />X❑yes❑No❑N <br />[flYes[:]Na❑N <br />[K]YesENo❑N <br />E]Yes E]No[:]NA <br />Turbine shutdown response time: <br />2-5sec <br />2-5sec <br />2-5sec <br />2-5sec <br />Is system programmed for fail-safe <br />shutdown?* <br />Yes N N <br />❑ � <br />X ❑ yes N N <br />❑ � <br />X ❑ Yes NOUN <br />❑ ^ <br />X ❑ Yes []No[]NA <br />❑ <br />Was fail-safe verified to be <br />operational?* <br />[Eyes ENoENA <br />Eyes F]NoE]N <br />E]Yes ONo[:]N <br />Yes []No❑N <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test: <br />5min <br />Smin <br />Stain <br />5min <br />Test Start Time: <br />13:05 <br />13:06 <br />6.402 <br />4.216 <br />Initial Reading (Rt ): <br />9.425 <br />4.396 <br />6.402 <br />4.216 <br />Test End Time: <br />13:2 0 <br />13 :21 <br />6 .4 02 <br />4.212 <br />Final Reading (RF ): <br />9.425 <br />4.396 <br />6.402 <br />4.212 <br />Test Duration: <br />15MIN <br />15MIN <br />15MIN <br />15MIN <br />Change in Reading (R F -Ri ): <br />.000GPH <br />.000GPH <br />.000GPH <br />.000GPH <br />Pass/Fail Threshold or Criteria: <br />-05CPH <br />.05GPH <br />_05GPH <br />.05GPH <br />'fest Result: <br />x <br />Pass D Fail <br />a PassEl <br />Fail <br />� Pass <br />E. <br />Fail <br />E <br />Pass <br />Ej <br />Rail <br />Was sensor removed for testing'? <br />EYesE]NoE]NA <br />EYesDNo❑NA <br />EYesL]No❑NA <br />❑x Yes ❑No[ -]N <br />Was sensor properly replaced and <br />verified functional after testing? <br />X ❑ YeC] N NA <br />X Ye ^ N ^ NA <br />❑ <br />X Ye ^ N^ <br />❑ JNA <br />X Yes N <br />❑ ❑ <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />t If the entire depth of the UDC is not tested, specify how much was tested. If the answer to an of the questions indicated with an <br />asterisk (*) is 'NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.