Laserfiche WebLink
• ECEk I <br />SWRCB, January 2002 <br />i.�wrmArwiML`N'f'IiTT!'\TFCTiN(: tiny 1 A 7M4 <br />- <br />" Industry Standard X Professional Engineer <br />Test Method Developed By: ❑ UDC Manufacturer <br />❑ Other (Specify) <br />Test Method Used: ❑ Pressure Vacuum X HY&PA ITMENT <br />❑ Other (Specify) <br />Test Equipment Used: Caldwell Level Change Indicator <br />Equipment Resolution: .002 <br />UDC #1&2 UDC#3&4 <br />UDC45&6 UDC#7&8 <br />UDC Manufacturer: <br />Bravo <br />Bravo <br />Coated Steel <br />Bravo <br />Coated Steel <br />Bravo <br />Coated Steel <br />UDC Material: <br />Coated Steel <br />UDC Depth: <br />Height from UDC Bottom to Top <br />10" <br />Enters From Bottom <br />10" <br />Enters From Bottom <br />10" <br />Enters From Bottom <br />10" <br />Enters From Bottom <br />of Highest Piping Penetration: <br />Height from UDC Bottom to <br />Enters From Bottom <br />Enters From Bottom <br />Enters From Bottom <br />Enters From Bottom <br />Lowest Electrical Penetration: <br />Dry <br />Dry <br />Condition of UDC prior to <br />Dry <br />Dry <br />testing: <br />Portion of UDC Tested <br />Water Level 8" <br />Water Level 8" <br />Water Level 8" <br />-Water Level 8" <br />Does turbine shut down when <br />No <br />UDC sensor detects liquid (both <br />No <br />No <br />No <br />roduct and water)? <br />N/A <br />N/A <br />N/A <br />Turbine shutdown response time <br />N/A <br />Is system programmed for fail- <br />Yes <br />Yes <br />Yes <br />Yes <br />safe shutdown? <br />Was fail-safe verified to be <br />No <br />No <br />No <br />No <br />operational?* <br />Wait time between applying <br />5 Minutes <br />5 Minutes <br />5 Minutes <br />5 Minutes <br />water and starting test <br />11:40 <br />11:45 <br />11:50 <br />Test Start Time: <br />11:35 <br />Initial Reading.001 <br />.001 <br />12:10 <br />.001 <br />12:15 <br />.001 <br />12:20 <br />Test End Time: <br />12:05 <br />Final Reading(RF): <br />.001 <br />30 Minutes <br />.001 <br />30 Minutes <br />.001 <br />30 Minutes <br />.001 <br />30 Minutes <br />Test Duration: <br />0 <br />0 <br />Change in Readin RF -R,: <br />Pass/Fail Threshold or Criteria: <br />0 <br />.005/30 Minutes <br />0 <br />.005/30 Minutes <br />.005/30 Minute <br />1 .005/30 Minutes <br />Test Result: <br />Pass <br />Pass <br />Pass <br />Pass <br />Was sensor removed for testing? <br />No <br />No <br />No <br />No <br />Was sensor properly replaced and <br />N/A <br />N/A <br />N/A <br />N/A <br />verified functional after testin ? <br />Comments — (include information on re airs made prior to testing, and recommended follow-up for failed tests) <br />If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />