My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2014-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
4075
>
2300 - Underground Storage Tank Program
>
PR0231667
>
COMPLIANCE INFO 2014-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 4:23:22 PM
Creation date
11/7/2018 5:08:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2014-2015
RECORD_ID
PR0231667
PE
2361
FACILITY_ID
FA0002121
FACILITY_NAME
JAMAR SERVICE
STREET_NUMBER
4075
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
15726411
CURRENT_STATUS
01
SITE_LOCATION
4075 E MAIN ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MAIN\4075\PR0231667\COMPLIANCE INFO 2014-2015.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • RECEIVE® <br />SWRCB, January 2002 NOV I91H14-of <br />c nrmtv� er1ARP Ti,•CTiN(_ <br />Test Method Developed By: D Sump Manufacturer ❑ Industry Standard ENVF"N <br />❑ Other (Specify) DEPARTMENT <br />Test Method Used: ❑ Pressure ❑ Vacuum X Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: Caldwell Level Change Indicator <br />Sump # 1-87 Sump # 2-91 <br />Sump Diameter: 42" 42" <br />Equipment Resolution:.002 <br />Sump # <br />Sump # <br />Sump Depth: <br />45" <br />45" <br />Sump Material: <br />Fiberglass <br />Fiberglass <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />21" <br />25" <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />21„ <br />15" <br />Condition of sump prior to testing: <br />Dry <br />Dry <br />Portion of Sump Tested' <br />Water Line 23" <br />Water Line 27" <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />product and water)?* <br />Yes <br />Yes <br />Turbine shutdown response time <br />Not Alarmed <br />Not Alarmed <br />Is system programmed for fail-safe <br />shutdown? <br />Yes <br />Yes <br />Was fail-safe verified to be <br />operational?* <br />No <br />No <br />Wait time between applying water <br />and starting test: <br />5 Minutes <br />5 Minutes <br />Test Start Time: <br />10:00 <br />10:10 <br />Initial Reading (R,): <br />.001 <br />.001 <br />Test End Time: <br />10:30 <br />10:40 <br />Final Reading (RF): <br />.001 <br />.001 <br />Test Duration: <br />30 Minutes <br />30 Minutes <br />Change in Reading (RF -R,): <br />0 <br />0 <br />Pass/Fail Threshold or Criteria: <br />.005/30 Minutes <br />.005/30 Minutes <br />Test Result: <br />Pass <br />Pass <br />Was sensor removed for testing? <br />Yes <br />Yes <br />Was sensor properly replaced and <br />verified functional at testing? <br />Yes <br />Yes <br />Comments (include information on repairs made prior to testing and recommended follow-up for failed tests) <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.