Laserfiche WebLink
• <br />D. Results of Testing/Servicing <br />Software Version Installed: <br />40 RECEIVED <br />JUN 18 2015 <br />mn lete the <br />following checklist: <br />Is the audible alarm operational? <br />® Yes <br />❑ No` <br />® Yes <br />❑ No' <br />Is the visual alarm operational? <br />® Yes <br />❑ No' <br />Were all sensors visually inspected, functionally tested, and confirmed operational? <br />® Yes <br />❑ No' <br />Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their proper <br />operator? <br />❑ Yes <br />❑ No' <br />If alarms are relayed to a remote monitoring station, is all communications equipment (e.g., modem) operational? <br />® Yes <br />® N/A <br />❑ No' <br />For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak, <br />If which sensors initiate positive shut -down? (Check all that appty) ® Sumpfrrench <br />❑ N/A <br />fails to operate, or is electrically disconnected? yes: <br />Sensors; ❑ Dispenser Containment Sensors. <br />Did you confine positive shut -down due to leaks and sensor failure/disconnection? ® Yes; ❑ No. <br />❑ Yes <br />❑ No- <br />For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e., no mechanical overfill prevention valve is <br />fill and operating property? If so, at what percent of tank capacity <br />® N/A <br />installed), is the overfill warning alarm visible and audible at the tank points) <br />does the alarm trigger? 0% <br />❑ <br />® No <br />Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced and list the manufacturer name <br />and model for all replacement parts in Section E, below. <br />Yes <br />® <br />❑ No <br />Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br />®Product; []Water. If yes, describe causes in Section E, below. <br />Yes <br />® Yes <br />❑ No- <br />Was monitoring system set-up reviewed to ensure proper settings? Attach set up reports, a applicable <br />® Yes <br />❑ No' <br />Is all monitoring equipment operational per manufacturer's specfications? <br />' In Section E below, describe how and when these deficiencies were or will be connected. <br />E. comments: CHAIN ON DISP 7-8 87 NEEDED A ADJUSTMENT <br />SMALL AMOUNT OF WATER FOUND IN 87 STP <br />Monitoring System Certification page 2 of 4 2/21/07 <br />TAL <br />NIT <br />