My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2014-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
4075
>
2300 - Underground Storage Tank Program
>
PR0231667
>
COMPLIANCE INFO 2014-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 4:23:22 PM
Creation date
11/7/2018 5:08:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2014-2015
RECORD_ID
PR0231667
PE
2361
FACILITY_ID
FA0002121
FACILITY_NAME
JAMAR SERVICE
STREET_NUMBER
4075
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
15726411
CURRENT_STATUS
01
SITE_LOCATION
4075 E MAIN ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MAIN\4075\PR0231667\COMPLIANCE INFO 2014-2015.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br />F. In -Tank Gauging / SIR Equipment: ® Check this box if tank gauging is used only for i e A�YI `I v / E� <br />❑ Check this box if no tank gauging or SIR equip en AY/ G <br />This section must be completed W in -tank gauging equipment is used to perform leak detection monitoring. JUN 18 2015 <br />Complete the following checklist: IY J <br />In Section H, below, aescnbe now ane wren mesa ueuu,eu.,o� ••=•o �• ••••• ••- <br />Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br />win checklist: <br />No' <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check all that apply) <br />Has all input wiring been inspected for proper entry and termination, including testing Tor ground Taunsr <br />N/A <br />Simulated leak rate: ®3 g.p.h.; ❑ 0.1 g.p.h [10.2 g.p.h. <br />Were all tank gauging probes visually inspected for tlamage and residue buildup? NFA! TN <br />No' <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />Was accuracy of system product level readings tested? <br />FCOm <br />KYesol, <br />Was the testing apparatus properly calibrated? <br />Was accuracy of system water level readings tested? <br />No' <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />Were all probes reinstalled properly? <br />N/ANo' <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />In Section H, below, aescnbe now ane wren mesa ueuu,eu.,o� ••=•o �• ••••• ••- <br />Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br />' In Section H, below, describe now ana wnen mesa ueocurru,ea ..ei. •.• .,_ ......__-__. <br />H. Comments: <br />Monitoring System Certification Page 3 of 4 2/21/07 <br />TAL <br />NIT <br />win checklist: <br />No' <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check all that apply) <br />N/A <br />Simulated leak rate: ®3 g.p.h.; ❑ 0.1 g.p.h [10.2 g.p.h. <br />No' <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />FCOm <br />No' <br />Was the testing apparatus properly calibrated? <br />No' <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />N/ANo' <br />For electronic LLOs, tloes the turbine automatically shutoff if the LLD detects a leak? <br />❑ <br />Yes <br />❑ <br />N/A <br />No' <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br />El <br />Yes <br />® <br />El <br />N/A <br />No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a lest? <br />® <br />N/A <br />❑ <br />Yes <br />❑ <br />No' <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />® <br />N/A <br />® <br />Yes <br />❑ <br />No' <br />Were all items on the equipment manufacturers maintenance checklist completed? <br />' In Section H, below, describe now ana wnen mesa ueocurru,ea ..ei. •.• .,_ ......__-__. <br />H. Comments: <br />Monitoring System Certification Page 3 of 4 2/21/07 <br />TAL <br />NIT <br />
The URL can be used to link to this page
Your browser does not support the video tag.