Laserfiche WebLink
0 <br />Monitoring System Certification UST Monitoring Site Plan RECEIVED <br />Site Address: JAMAR SERVICE 4076 EAST MAIN STREET STOCKTON CA 96201-0326 JUN 18 2015 <br />N U <br />S <br />T <br />R <br />.................. <br />E..:........... .......... ............................... <br />T:.............................................................. <br />Date map was drawn:5-15-2014 <br />Instructions <br />If you already have a diagram that shows all required information, you may include it, rather than this page, with your Monitodng System Certification. On your site plan, <br />show the general layout of tanks and piping. Clearly identify locations of the following equipment, 0 installed: monitoring system control panels; sensors monitoring tank <br />annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak detectors; and in -tank liquid level <br />probes (if used for leak detection). In the space provided, note the date this Site Plan was prepared. <br />Monitoring System Certification Page 4 of 4 2/21/07 <br />..........::::::: <br />cryv1HUNMEN' <br />................. FA!tu.neoenTnAel <br />A=ANNULAR <br />F=FILLS <br />. . . . . . <br />V=VAPOR <br />. . . . <br />N U <br />S <br />T <br />R <br />.................. <br />E..:........... .......... ............................... <br />T:.............................................................. <br />Date map was drawn:5-15-2014 <br />Instructions <br />If you already have a diagram that shows all required information, you may include it, rather than this page, with your Monitodng System Certification. On your site plan, <br />show the general layout of tanks and piping. Clearly identify locations of the following equipment, 0 installed: monitoring system control panels; sensors monitoring tank <br />annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak detectors; and in -tank liquid level <br />probes (if used for leak detection). In the space provided, note the date this Site Plan was prepared. <br />Monitoring System Certification Page 4 of 4 2/21/07 <br />