My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2014-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
4075
>
2300 - Underground Storage Tank Program
>
PR0231667
>
COMPLIANCE INFO 2014-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 4:23:22 PM
Creation date
11/7/2018 5:08:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2014-2015
RECORD_ID
PR0231667
PE
2361
FACILITY_ID
FA0002121
FACILITY_NAME
JAMAR SERVICE
STREET_NUMBER
4075
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
15726411
CURRENT_STATUS
01
SITE_LOCATION
4075 E MAIN ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MAIN\4075\PR0231667\COMPLIANCE INFO 2014-2015.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />Monitoring System Certification UST Monitoring Site Plan RECEIVED <br />Site Address: JAMAR SERVICE 4076 EAST MAIN STREET STOCKTON CA 96201-0326 JUN 18 2015 <br />N U <br />S <br />T <br />R <br />.................. <br />E..:........... .......... ............................... <br />T:.............................................................. <br />Date map was drawn:5-15-2014 <br />Instructions <br />If you already have a diagram that shows all required information, you may include it, rather than this page, with your Monitodng System Certification. On your site plan, <br />show the general layout of tanks and piping. Clearly identify locations of the following equipment, 0 installed: monitoring system control panels; sensors monitoring tank <br />annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak detectors; and in -tank liquid level <br />probes (if used for leak detection). In the space provided, note the date this Site Plan was prepared. <br />Monitoring System Certification Page 4 of 4 2/21/07 <br />..........::::::: <br />cryv1HUNMEN' <br />................. FA!tu.neoenTnAel <br />A=ANNULAR <br />F=FILLS <br />. . . . . . <br />V=VAPOR <br />. . . . <br />N U <br />S <br />T <br />R <br />.................. <br />E..:........... .......... ............................... <br />T:.............................................................. <br />Date map was drawn:5-15-2014 <br />Instructions <br />If you already have a diagram that shows all required information, you may include it, rather than this page, with your Monitodng System Certification. On your site plan, <br />show the general layout of tanks and piping. Clearly identify locations of the following equipment, 0 installed: monitoring system control panels; sensors monitoring tank <br />annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak detectors; and in -tank liquid level <br />probes (if used for leak detection). In the space provided, note the date this Site Plan was prepared. <br />Monitoring System Certification Page 4 of 4 2/21/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.