My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING 2008-2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1206
>
2300 - Underground Storage Tank Program
>
PR0231175
>
BILLING 2008-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 4:26:19 PM
Creation date
11/7/2018 6:08:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
2008-2010
RECORD_ID
PR0231175
PE
2361
FACILITY_ID
FA0001247
FACILITY_NAME
DP & DK Investments, Inc.
STREET_NUMBER
1206
Direction
E
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
1206 E MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MARCH\1206\PR0231175\BILLING 2008-2010.PDF
QuestysFileName
BILLING 2008-2010
QuestysRecordDate
4/6/2018 10:45:38 PM
QuestysRecordID
3848565
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> UNIFIED PROGRAM CONSOLIDATED FORM <br /> TANKS <br /> UNDERGROUND STORAGE TANKS - TANK PAGE 1 <br /> (Two pages per tank) <br /> Page 4 of 7 <br /> TYPE OF ACTION ❑ 1.NEW PERMIT ❑ 4.AMENDED PERMIT ® 5.CHANGE OF INFORMATION ❑ 6.TEMPORARY TANK CLOSURE 430. <br /> (Check one hem only) ❑ 3.RENEWAL PERMIT ❑ 7.PERMANENTLY CLOSED ON SITE <br /> (Specify reason) (Specify reason) ❑ 8.TANK REMOVED <br /> BUSINESS NAME(Same as FACILITY NAME or DBA-Doing Business As) 3. 1 FACILITY ID: I. <br /> Rai Gas Stations,Inc.dba March Lane 76 77 � <br /> LOCATION WITHIN SITE(Optional) 431 <br /> I.TANK DESCRIPTION <br /> (A scaled plot plan with the location of the UST system including buildings and landmarks shall be submitted to the local agency.) <br /> TANK ID# 432• TANK MANUFACTURER 433• COMPARTMENTALIZED TANK ❑Yes ® No 434. <br /> TA-0117507 XERXES If"Yes;'complete one page for each compartment. <br /> DATE INSTALLED 435. TANK CAPACITY IN GALLONS 436• NUMBER OF COMPARTMENTS <br /> (YEAR/MO) 437. <br /> 01/01/1991 9,728 1 <br /> ADDITIONAL DESCRIPTION(For local use only) 438 <br /> II.TANK CONTENTS <br /> TANK USE 439• PETROLEUM TYPE 440. <br /> ® 1. MOTOR VEHICLE FUEL <br /> ❑ In. REGULAR UNLEADED ❑2. LEADED ❑5. JET FUEL <br /> (Ifchecked,complete Petroleum Type) ❑Ib. PREMIUM UNLEADED 19 3. DIESEL ❑6. AVIATION GAS <br /> ❑ 2. NON-FUEL PETROLEUM ❑lc. MIDGRADE UNLEADED ❑4. GASOHOL ❑99.OTHER: <br /> ❑ 3. CHEMICAL PRODUCT COMMON NAME (from Hazardous Materials Inventory page) 441. CAS#(from Hazardous Materials Inventory page) 442• <br /> ❑ 4. HAZARDOUS WASTE Diesel 68476-34-6 <br /> (Includes Used Oi0 <br /> ❑ 95.UNKNOWN <br /> III.TANK CONSTRUCTION <br /> TYPE OF TANK ❑ I. SINGLE WALL U 3. SINGLE WALL WITH EXTERIOR 175. SINGLE WALL WITH INTERNAL BLADDER SYSTEM 443. <br /> (Check one item only) MEMBRANE LINER ❑95. UNKNOWN <br /> ®2. DOUBLE WALL ❑4. SINGLE WALL IN A VAULT ❑99. OTHER_ <br /> TANK MATERIAL-primary tank 10"ARE STEEL LJ 3. FIBERGLASS/PLASTIC 5. CONCRETE 0 95.UNKNOWN 444. <br /> (Check one hem only) ❑2. STAINLESS STEEL [14. STEEL CLAD W/FIBERGLASS ❑8. FRP COMPATIBLE ❑99.OTHER: <br /> REINFORCED PLASTIC(FRP) W/100%METHANOL <br /> TANK MATERIAL-secondary tank 0 1. BARE STEEL 0 3. FIBERGLASS/PLASTIC 8. FRP COMPTIBLE W/100%METHANOL 95.UNKNOWN 445. <br /> (Check one item only) ❑2. STAINLESS STEEL❑4. STEEL CLAD W/FIBERGLASS ❑9. FRP NON-CORRODABLE JACKET ❑99.OTHER <br /> REINFORCED PLASTIC(FRP) ❑ 10. COATED STEEL <br /> ❑5. CONCRETE <br /> TANK INTERIOR LINING L RUBBER LINED LJ 3.EPDXY LINING LJ 5.GLASS LINING El 95.UNKNOWN 446. DATE INSTALLED 447. <br /> OR COATING ❑2.ALKYD LINING ❑4.PHENOLIC LINING ®6.UNLINED ❑99.OTHER <br /> Check one item only) <br /> OTHER CORROSION 0 L MANUFACTURED CATHODIC LJ 3,FIBERGLASS REINFORCED PLASTIC LJ 95.UNKNOWN 448. DATE INSTALLED 449. <br /> PROTECTION PROTECTION ❑4.IMPRESSED CURRENT ❑99.OTHER <br /> (IfA licable) ❑2.SACRIFICIAL ANODE <br /> SPILL AND OVERFILL YEAR INSTALLED 450. TYPE 451. OVERFILL PROTECTION EQUIPMENT: YEAR INSTALLED 452. <br /> (Check all that apply) ®1.SPILL CONTAINMENT 2003 ❑1.ALARM _®3.FILL TUBE SHUT OFF VALVE <br /> ®2.DROP TUBE 2003 ❑2.BALL FLOAT_❑4.EXEMPT <br /> ®3.STRIKER PLATE 1998 <br /> IV.TANK LEAK DETECTION <br /> (A description of the monitoring program shall be submitted to the local agency.) <br /> IF SINGLE WALL TANK 453. IF DOUBLE WALL TANK OR TANK WITH BLADDER 454. <br /> (Check all that apply) (Check one item only) <br /> ❑1.VISUAL(EXPOSED PORTION ONLY) ❑5.MANUAL TANK GAUGING(MTG) ❑1.VISUAL(SINGLE WALL IN VAULT ONLY) <br /> ❑2.AUTOMATIC TANK GAUGING(ATG) ❑6.VADOSE ZONE ®2.CONTINUOUS INTERSTITIAL MONITORING <br /> ❑3.CONTINUOUS ATG ❑7.GROUNDWATER ❑3.MANUAL MONITORING <br /> ❑4. STATISTICAL INVENTORY RECONCILIATION ❑8.TANK TESTING <br /> (SIR)+BIENNIAL TANK TESTING ❑99.OTHER <br /> V.TANK CLOSURE INFORMATION/ PERMANENT CLOSURE IN PLACE <br /> ESTIMATED DATE LAST USED(YR/MO/DAY) 455. ESTIMATED QUANTITY OF SUBSTANCE REMAINING 456. TANK FILLED WITH INERT MATERIAL? 457. <br /> gallons ❑Yes ❑ No <br /> UPCF hwfwrc-b(1/99)-1/4 www.unidocs.org Rev.02/16/00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.