My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1991
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MCKINLEY
>
16177
>
2300 - Underground Storage Tank Program
>
PR0232391
>
REMOVAL_1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 4:48:17 PM
Creation date
11/7/2018 6:57:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1991
RECORD_ID
PR0232391
PE
2381
FACILITY_ID
FA0003649
FACILITY_NAME
SULLIVAN & MANN LUMBER CO
STREET_NUMBER
16177
Direction
S
STREET_NAME
MCKINLEY
STREET_TYPE
AVE
City
LATHROP
Zip
95330
CURRENT_STATUS
02
SITE_LOCATION
16177 S MCKINLEY AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\M\MCKINLEY\16177\PR0232391\REMOVAL 1991.PDF
QuestysFileName
REMOVAL 1991
QuestysRecordDate
9/21/2017 5:00:30 PM
QuestysRecordID
3644852
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HEALTH and SAFETY PLAN <br /> Page 2 <br /> At the job site , clean fill will be used to backfill the empty hole <br /> after soil samples have been taken by Condor Earth Technologies Inc . <br /> Soil samples will be excavated using backhoe . Samples will be taken <br /> two (2 ) feet to four (4) feet by hand using brass tubes . All of the <br /> above procedures will be done according to code . Any part not <br /> backfilled shall be barricaded with construction barricades and <br /> caution tape will be used . <br /> Oil Equipment Service will use equipment for each tank removal . <br /> No undersize or bad mechanical equipment will be used . All heavy <br /> equipment will be supported properly . Tanks are to be secured at <br /> the assigned location after extraction . <br /> Oil Equipment Service will provide safety hats , goggles , and clothing <br /> to employees at the job site as per OSHA regulation 29 CFR 1910 . 120 . <br /> Caution will be noted that a heat stress situation may develop when <br /> impermeable protective clothing is worn . <br /> Oil Equipment Service will hold shop meetings before start of tank <br /> removals to discuss safety procedures , The "buddy system" will be <br /> discussed and the course of action to be taken should an injury <br /> occur to an employee . Some of the many rules to be discussed to <br /> help prevent infury or accident are : 1 ) avoid standing on top of <br /> tank - - surface maybe slippery or rusty , 2) check for falling <br /> objects , slipping , and tripping hazards , 3) visqueen sheeting will be <br /> used if necessary around excavated soil , 4) where necessary , the site <br /> will be secured with construction barricades and warning signs posted <br /> to prevent the exposure of unauthorized , unprotected people to site <br /> hazards , 5) limit exposure time to noisy equipment , 6) keep a safe <br /> distance from the excavation and heavy equipment , 7 ) stay up-wind <br /> from the tank and/or excavation to avoid unnecessary exposure when- <br /> ever possible , 8) limit exposure by minimizing the exposure time and <br /> maximizing the distance to the source of vapor release , 9 ) avoid the <br /> area or take special caution when ventilating the tank with water , <br /> dry ice or air , 10) do not enter the excavation without first <br /> monitoring the air . <br /> Oil Equipment Service shall provide San Joaquin Public Health Service <br /> a map of the nearest hospital and route to be taken should an injury <br /> occur . A copy of the map will also be on the job site . <br />
The URL can be used to link to this page
Your browser does not support the video tag.