Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN—(Page 2 of 2 <br /> Vt.UNDER DISPENSER CONTAINMENT(UDC)MONITORING rr <br /> - 112111 aYYI)9 <br /> UDC,MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) <br /> ® 1.CONTINUOUS ELECTRONIC MONITORING ❑ 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE <br /> ❑ 4.NO DISPENSERS ❑ 99.OTHER(Specify) 490-sqb. <br /> LEAK MONITOR MANUFACTURER:Veeder-Root 49°35' MODEL d:TLS-56 490-56 <br /> LEAK SENSOR MANUFACTURER BeaudreauK 490.51' MODEL ff(S):406 wo511. <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ® a.YES ❑ b.NO 490-59' <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a-YES ❑ In NO w9-6o. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER ® a.YES ❑ In.NO 49x61 <br /> UDC CONSTRUCTION IS: ® 1.SINGLE WALL ❑ 2.DOUBLE WALL wa6x <br /> IF DOUBLE WALL worm. <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ❑ a LIQUID ❑ In.PRESSURE ❑ c.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a.YES ❑ b.NO dM-64b. <br /> VIL PERIODIC SYSTEM TESTING <br /> ❑ L EI.D TESTING: THIS FACILTIY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED -0 5- <br /> LEAK D TECTION ff!M MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.hJCCR g2a44.q <br /> ® 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 4906a <br /> ® 3.SPILL BUCKETS ARE TESTED ANNUALLY. 49asT. <br /> VIII:'-RECORD KEEPING <br /> The following monituring/maintenance records are kept for this facility: 490 sx. <br /> ® a.ALARM LOGS ❑ b.VISUAL INSPECTION RECORDS ❑ G TANK 1,TEGRIIY TESTING RESULTS <br /> ❑ d.SIR TESTING RESULTS(and supporting documentation records) ❑ e.TANK GAUGING RESULTS(and supporting documentation records) <br /> ❑ f.ATG TESTING RESULTS(and supporting documentation records) ❑ g.CORROSION PROTECTION 60-DAY LOGS <br /> ® h.EQUIPMENT MAINTENANCE AND CALIBRATION RECORDS <br /> _ ;LY. TRAINING <br /> ® Personnel with UST monitoring responsibilities are familiar with all ofthe following documents relevant to theirjob denies: g9ofi94. <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that appy) <br /> M THIS UNDERGROUND STORAGE TANK h10NITORING PLAN(Required) 490<9b. <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) 4so69o. <br /> IM CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 40b9d <br /> ® CALIFORNIA UNDERGROUND STORAGE TANK LAW 4sOs9 <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND 19 9f <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> ❑.SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 490 . <br /> OTHER(Specify):Procedure written and training for use of waste oil tank 9oas <br /> This facility:-'s a"Designated UST Operator"who has passed the Glifamia UST System Opara]or Etmm administered by the Lrtemafional Code Council 490'0. <br /> (ICC). The "Designated UST OpermoT will train facility employees in the proper operation and maintenance ofthe UST systems annually,and within 30 <br /> days ofhire.This training will include,but is not limited to,the following: <br /> ➢ Operation ofthe UST systems in a rammer consistent with the facility's best management practices. <br /> The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan. <br /> > The facility employee's role with regard to spills and overfills as.pec flied in the facility's UST Response Plan. <br /> D Name(s)ofcontact person(s)fm emergencies and monitoring alaxon& <br /> X. COMMENTS/ADDITIONAI3NFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are atreal ed to this plane. 490-11. <br /> Overfill:OPW 61 Overfill Droptube Set 95%shut off <br /> XI. PERSONNEL RESPONSIBILITIES <br /> The UST Ouner,'Operator is responsible for ensuring that:1.)the daily/routine UST monitoring activities and nuinterau ce of UST leak detection equipment covered <br /> by this plan occurs,2.)all conditions that indicate a possible mime we investigated;and 3.)all monitoring records are maintained properly, <br /> THE FOLLOWING PERSON(S)ARE RESPONSIBLE.FOR PERFORMING THE MONITORING AND EQUIPMENT MAINTENANCE: <br /> NAME; Kevin Selby 490-7. TTTLF:Facilities Manager 490.73. <br /> NAME: Doug Duboce 49074. TITLE:Designated UST Operator /90-95' <br /> The Designated UST Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform the mover/operator of any <br /> conditions that need follow-up action. <br /> XII: OWNEWOPERATOR SIGNATURE'' <br /> CERTIFICATION:I urtiry that the information provided herein is true and accurate to the best of my knowledge <br /> APPLICANT SIGNATURE (, DATE: dean. <br /> 6/1/2011 <br /> REPRESEMING:O 1.Tank 490-76 <br /> APPLICANTNAME(prim): . / 490-'a APPLICANTTITLE:. wo79. <br /> UPCF UST-D(1212007)-3/4 wrrw.mridoo.otg <br /> I� <br /> 1 <br />