My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING 2007 - 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MCKINLEY
>
16888
>
2300 - Underground Storage Tank Program
>
PR0232523
>
BILLING 2007 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 3:16:07 PM
Creation date
11/7/2018 6:59:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
2007 - 2015
RECORD_ID
PR0232523
PE
2361
FACILITY_ID
FA0003833
STREET_NUMBER
16888
STREET_NAME
MCKINLEY
STREET_TYPE
Ave
City
Lathrop
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
16888 McKinley Ave
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MCKINLEY\16888\PR0232523\BILLING 2007 - 2015 .PDF
QuestysFileName
BILLING 2007 - 2015
QuestysRecordDate
3/14/2017 6:05:19 PM
QuestysRecordID
3352980
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- (Pae 1 of 2) <br /> TYPI'.OF ACTION ❑ I.NEW PLAN ❑ 2.CHANGE OF INFORMATION 4x61. <br /> PLAN TYPE KI I.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 4�w-z. <br /> (Chef l:tine item wdv) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S). <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) <br /> 1 _ <br /> BUS NESS NAME(Same as Facility Name or DBA) 3. <br /> SUPER STORE INDUSTRIES <br /> BUSINESS SITE ADDRESS CITY lw. <br /> 16888 McKinley Avenue Lathrop <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(eg.,sensors,probes,line leak detectors,etc.)must be performed at the frequency specified <br /> by the equipment manufacturers instructions,or annually whichever morefrequent Such.work must be performed by qualified parsonnel,In ccRyze3z,x634,z63x,264§ <br /> _ ..... _ .__ _ <br /> MONITORING EQUIPMENT IS SERVICED I ANNUALLY49"3` <br /> ❑ 99.OTHER(Specify): 4,�3b <br /> III. MONITORING LOCATIONS <br /> ❑ I.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ❑ 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED 123 CCR 12632,26341 i90-0 <br /> IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) <br /> that apply) <br /> (Check all <br /> I CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACES)OR SECONDARY CONTAINMENT VAULT(S) 490-5. <br /> 'AT FH AUDIBLE AND VISUAL ALARMS.123CCR§2632.26341 <br /> SECONDARY CONTAINMENT IS: ❑ a.DRY ® b.LIQUID FILLED ❑ C.PRESSURIZED ❑ d.UNDER VACUUM 4906. <br /> PANEL MANUFACTURER. Veeder-Root 4N1-7' MODEL#: TLS-350 490-8 <br /> LEAK SENSOR MANUFACTURER: VeedeI-Root 4x1"9, MODEL#(S):V �2. 490H0 <br /> ❑ 2 Al'TOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR ANGLE WALL TAWS).123 CCR g2ra3l 41Xi=1i. <br /> PANEL MANUFACTURER: 4x1-I2MODEL#: 4w13 <br /> I IN-TANK PROBE MANUFACTURER: 4:0614 MODEL#(S): 4x1-I5 <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ It.DAILY/NIGHTLY ❑ c.WEEKLY 49'"16 <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 4w.17 <br /> PROGRAMMED TESTS: ❑ a.01 h 490.18. <br /> _.. ......... _._.. BP ..__......0 b 02B_p:h_ Q-,a OTHER(Specify)_ _ 49n.,19. <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION 123CCR§2646.11 490-20. <br /> ❑ 4.N L EKLY MANUAL TANK GAUGING(MTG)I23 tcR 4x6451 TESTING PERIOD ❑ a 36 HOURS ❑ b.60 HOURS 449z0i21. <br /> i.TANK INTEGRITY TESTING PER Iz3 ccR gzra311 4aua3. <br /> TEST FREQUENCY CX a.ANNUALLY ❑ b BIENNIALLY (] c.OTHER(Specify) 494 2. 4 <br /> ❑ 99.OTHER(Specify). ---4B 26.- <br /> 490-x). <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHODS) iso°a0 <br /> x.CONTINUOUS MONITORING OF PIPEIPIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. 490-2K <br /> 123 CCR <br /> 1,6,3;,1 SECONDARY CONTAINMENT IS: �'] a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 49°29- <br /> ' 4%-30 _ <br /> PANEL MANUFACTURER: VPpdi=r-ROo1- MODEL#: TT-.q 35t aw.n. <br /> LEAK SENSOR MANUFACTURER: Veeder-Root 490-32, MODEL#(S): 4m-33. <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. _ Ota ❑ b.NO 4x1.34. <br /> 1 FAILURUDISCONNECTION OFTHE MONII'OR1NG SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. a.YES ❑ b.NO 49636. <br /> ( 2. MECHANICAL LINE LEAK DETECTOR(MELD)THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF 4ID.311 <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.123 CCR§26361 <br /> MLLD MANUFACTURER(S)'. VtAI qg 4x133 MODEL#(S): J-02600 4''163x. <br /> El EI ECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p h.LEAK TESTS.123CCR§w361 4m-311 <br /> ELLD MANUFACTURER(S): 4'0'00- MODEL#(5): _ 0x141. <br /> PROGRAMMED IN LINE LEAK TEST: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. 4w.42. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b. 0 19 11 <br /> ELLD FAILUREIDISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN._ ❑ a.YES ❑ b.NO 1A}01 <br /> ❑ J.PI PE INTEGRITY TESTING. <br /> 49ws <br /> TEST FREQUENCY: ❑ a.ANNUALLY __.❑ b EVERY 3 YEARS ❑ c OTHER(Specify) 4YUa 46 <br /> i. VISUAL PIPE MONITORING. - 4x18_ <br /> FREQUENCY: )a a.DAILY ❑ b.WEEKLY ❑ C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED' 49 19. <br /> -- ... _.,_ All Mfo mommnng fun6uned emerguKygeneruorf Ipng pnnHS_C..§23382yb$IZ__ <br /> G.5LC'I ION PIPING MEETS EXEMPTION CRITERIA 3 ccR gzn6cxX3)I 4x650. <br /> 7 NO REGULATED PIPING PER HEALTH AND SAFE FY CODE,DIVISION 20 CHAPTER 6.7 I5 CONNECTED TO THE TANK SYSTEM. 4'wsi. <br /> i ❑ 99.0'I HER(Specify) .....-.."_.-....-_______... ...._-...____a91Gsi... <br /> 49053 <br /> 1'PCF Iis"f-D(1212007)-I/4 www.unidoes.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.