Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN— (Page 2 of 2 <br /> VI. UNDER DISPENSER CONTAINMENT(UDC)MONITORING (Checkarrl <br /> that <br /> UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) <br /> XX I.CONTINUOUS ELECTRONIC MONITORING ❑ 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE 49059 <br /> ❑ 4.NO DISPENSERS ❑ 99,OTHER(Specify) 49a54b. <br /> LEAK MONITOR MANUFACTURER: Veeder—Root 490-55. MODEL u: TLS-350 490651L <br /> LEAK SENSOR MANUFACTURER: Beal2dreauX 43tl51 MODEL N(S): 406 490,511. <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. a.YES ❑ b.NO 990'39' <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN, a.YES ❑ b.NO 490'60. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 490,61. <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. a.YES ❑ b.NO 490'61 <br /> _......—_._. ----[-12— <br /> _— _. ._.__..._..._ <br /> UDC CONSTRUCTION IS: ® 1.SINGLE WALL ❑__2._.DOUBLE WALL 490'61 <br /> IF DOUBLE WALL: 490.1. <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ❑ a.LIQUID ❑ b.PRESSURE ❑ c.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a.YES ❑ b.NO 49011. <br /> VII. PERIODIC SYSTEM TESTING <br /> I.ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 49043. <br /> LEAK DETECTION ELD MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.Im CCR 1.21 it <br /> ® 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 49046. <br /> ® 3.SPILL BUCKETS ARE TESTED ANNUALLY. 4057 <br /> VIII. RECORD KEEPING <br /> The following monitoringlmaintenance records are kept for this facility: 490,66. <br /> ® a.ALARM LOGS ❑ b.VISUAL INSPECTION RECORDS ❑ c.TANK INTEGRITY TESTING RESULTS <br /> ❑ d.SIR TESTING RESULTS(and supporting documentation records) ❑ e.TANK GAUGING RESULTS(and supporting documentation records) <br /> ❑ L ATG TESTING RESULTS(and supporting documentation records) ❑ g.CORROSION PROTECTION 60-DAY LOGS <br /> ® h.EQUIPMENT MAINTENANCE AND CALIBRATION RECORDS <br /> IX. TRAINING <br /> ® Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to theirjob duties: <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) 490,494. <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) 49069x. - <br /> CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490,49-7. <br /> CALIFORNIA UNDERGROUND STORAGE TANK LAW 490,6% <br /> ❑STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS MANUAL AND 490,69r <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 490'69& <br /> ❑ OTHER(Specify): 490,69h. <br /> 490594. <br /> This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council 490-70. <br /> (ICC). The "Designated UST Operator'will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 <br /> days of hire.This training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan. <br /> D The facility employee's role with regard to spills and overfills as specified in the facility's UST Response Plan. <br /> D Name(s)of contact person(s)for emergencies and monitoring alarms. <br /> X. COMMENTS/ADDITIONALINFORMATION <br /> Provide additional comments here or indicate how in pages with addif al information on specific monitorin rocedures are Cached to this plan. 490.1 1, <br /> 4 l� l-. <br /> XI. PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that: 1,)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered <br /> by thiuian_occurs;?,Call conditions that_indicate apooss ble release are,investkated1-and 3.�ail monitoring.raords are maintet <br /> THE FOLLOWING PERSON(S)ARE RESPONSIBLE FOR PERFORMING THE MONITORING AND EQUIPMENT MAINTENANCE: <br /> NAME: Kevin Selby 490.1 TITLE Operations & Facility Mgr, 490.13 <br /> NAME: Dan Mcllrath 490.14 TITLE: Designated UST Operator 490.75. <br /> The Designated UST Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform the ownedoperator of any <br /> conditions that need follow-up action. <br /> XII. OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:1 certify that the information provided herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE DATE: 49o-77. <br /> REPRESINTRJG'.❑I.Tank Oww asor 2FaciIi 0..d0r 3.AuNaisdR resmaaveof0wna 490-76. <br /> APPLICANT NAME(print): 490.76. APPLICANT TITLE: 490x9. <br /> Kevin Splhg operations & Facililty Mgr. <br /> UPCF UST-D(12/2007).314 www.unidocs.org <br />