My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MCKINLEY
>
16888
>
2300 - Underground Storage Tank Program
>
PR0232523
>
COMPLIANCE INFO_2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 3:29:57 PM
Creation date
11/7/2018 6:59:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0232523
PE
2361
FACILITY_ID
FA0003833
STREET_NUMBER
16888
STREET_NAME
MCKINLEY
STREET_TYPE
Ave
City
Lathrop
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
16888 McKinley Ave
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MCKINLEY\16888\PR0232523\COMPLIANCE INFO 2016 - PRESENT .PDF
QuestysFileName
COMPLIANCE INFO 2016 - PRESENT
QuestysRecordDate
3/15/2017 3:43:37 PM
QuestysRecordID
3353613
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In-Tank Gauging I SIR Equipment: ❑ Check this box if tank gauging is used only for inventory control,. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No" Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑ Yes ❑ No' Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No' Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No' Was accuracy of system water level readings tested? re <br /> ❑ Yes ❑ No' Were all probes reinstalled properly? <br /> ❑ Yes ❑ No` I Were all items on the equipment manufacturer's maintenance checklist completed? <br /> 'In Section H,below,describe how and when these deficiencies were or will be corrected. N 0 V <br /> Line Leak Detectors(LLD); ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: H <br /> Yes ❑ No' For equipment start-up or annual equipment certification, was a leak simulated to verify LLD perforrpapcg2,[Gq�ek all ibsfrapplyJ <br /> [I N/A Simulated leak rate: ®3 g.p.h.; El 0.1 g.p.h; El 0.2 g.p.h. lJJ��Ht f IVIG IV l <br /> ® Yes ❑ No' Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ® Yes ❑ No' Was the testing apparatus properly calibrated? <br /> ® Yes ❑ No' For mechanical LLDs,does the LLD restrict product Flow if it detects a leak? <br /> ❑ NIA <br /> ❑ Yes ❑ No' For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ® NIA <br /> ❑ Yes ❑ No' For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br /> ® NIA <br /> ❑ Yes ❑ No' For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> NIA <br /> ❑ Yes ❑ No' For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> NIA <br /> ( Yes ❑ No' Were all items on the equipment manufacturer's maintenance checklist completed? <br /> 'In Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Monitoring System Certification Page 3 of 4 2/21/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.