Laserfiche WebLink
R EEPDMonitoring System Certification LIST Monitoring Site Plan <br /> Site Address: ORE INDUSTRIES 16888 MCKINLEY DRIVE LATHROP CA 95330 <br /> . . . . . . . . . . . . . . . . <br /> 4. . . <br /> El WIRONMENTAL HEALTH . . . <br /> DEPARTMENT . . . . . . . 3. <br /> . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . <br /> Z . . . <br /> . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . <br /> . . . . . . . . . . . . . <br /> . . . . . . . . . . . . VENTS. . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . <br /> TL <br /> . . . . . . . . . . . . x x <br /> TL <br /> WASTE OIL NEW OIL <br /> . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . G G (D <br /> EAST WEST <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . DIESEL DIESEL <br /> hIa . . . . . . . . . . . . . . . . . . . . I . <br /> k—ANNULAR . . . . . . . . . . . . . . . . . . <br /> U FILLS . . . . . . . . . . . . . . . . . . . . . . . <br /> T=TURBINE . . . . . . . . . . . . . . . . . <br /> P=PROBE . . . . . . . . . . . . . . . . . . . . <br /> V=VAPOR . . . <br /> X=SUMP SENSOR <br /> L=LD <br /> M=Manway <br /> B=Brine Sensor . . . . . . . <br /> I=Smart Sensor . . . . . . . . . . . . . . I . . . . . . . . <br /> S=STP . . . . . . . . . . . . . . . . . . . . <br /> C=Floats&Chains . . . . . . . . . . . . . . . . <br /> E—E Stop . . . . . . . . . . . . . . . . . . . . . <br /> Date map was drawn:2017 <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,if installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 4 <br />