My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2000
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MENDOCINO
>
1081
>
2300 - Underground Storage Tank Program
>
PR0231180
>
REMOVAL_2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 11:58:44 AM
Creation date
11/7/2018 7:07:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2000
RECORD_ID
PR0231180
PE
2361
FACILITY_ID
FA0001143
FACILITY_NAME
UNIVERSITY OF THE PACIFIC
STREET_NUMBER
1081
Direction
W
STREET_NAME
MENDOCINO
STREET_TYPE
AVE
City
STOCKTON
Zip
95211
CURRENT_STATUS
02
SITE_LOCATION
1081 W MENDOCINO AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\M\MENDOCINO\1081\PR0231180\REMOVAL 2000 .PDF
QuestysFileName
REMOVAL 2000
QuestysRecordDate
8/29/2017 6:20:18 PM
QuestysRecordID
3610515
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Medical <br /> All contractor and subcontractor field personnel assigned to this operation will <br /> have completed a comprehensive medical examination within the last 12 months. <br /> C. Field Supervision <br /> All field activities will be supervised by a Field Supervisor having training and <br /> experience commensurate with the activity. Field Supervisors have the authority <br /> and responsibility to correct any unsafe act or condition during the course of <br /> operations. <br /> D. Safe Work Practices <br /> All contractor and subcontract personnel assigned to the operation will follow <br /> safe work practices including good personal hygiene, reporting all injuries, <br /> following instructions, inspecting equipment before use, anticipating hazards, <br /> utilizing the buddy system, etc. <br /> E. Job Safety Review <br /> Field Supervisors will conduct daily pre-operations safety meetings with all <br /> contractors and subcontractor personnel. <br /> VII. SPECIFIC HEALTH AND SAFETY REQUIREMENTS <br /> A. Site Control <br /> Work zones and other site control measures will be established as needed for the <br /> operation, depending on chemical hazards, work location and other requirements. <br /> B. Decontamination <br /> When personal protective clothing and equipment (i.e., respirators) are required <br /> for use, standard decontamination procedures shall be followed. <br /> 1. Recommended Procedure <br /> (a) Move to designated area(decontamination station). <br /> (b) Wash boots, gloves and suit, as needed. <br /> (c) Remove tape. <br /> (d) Remove disposable suit (from the inside, out) <br /> (e) Remove boots. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.