Laserfiche WebLink
Veeder-Root In-Station Diagnostics (ISD) <br /> ISD Past-installation Checklist <br /> SERVICE COMPANY NAME _ [ <br /> DATE <br /> TELEPHONE <br /> sERVICTECHNICIAN VEEDER-ROOT TECH CERTIFICATION <br /> TRAINING LEVEL(CIRCLE ONE): 213 or 4 ISD TRAINED? <br /> STATION NAME <br /> STATION ADDRESS CITY <br /> STATE ZIP <br /> WARNING! <br /> Before installing any vapor recovery equipment the installer must be familiar with all state and federal <br /> regulations regarding the safe installation and operation of each component. (NFPA 30A). <br /> A level 2, 3 or 4 certified Veeder-Root contractor or Authorized Service Contractor(ASC)with Veeder- <br /> Root In-Station Diagnostics training must be available(on-site)to over-see this post-installation checklist. <br /> Review and comply with all the safety warnings in the installation manuals and any other national, State <br /> or Local requirements. <br /> For a complete list of precautions, please consult the Veeder-Root ISD manuals. <br /> Required Reference Manuals <br /> In-Station Diagnostic Install,Setup and Operation Manual,Manual No.577013-800 n <br /> In-Station Diagnostic System Troubleshooting Guide,Manual No.577013-819 <br /> Fools Needed <br /> The following program is available and provided to level 2, 3 or 4 certified contractors who have passed <br /> the Veeder-Root In-Station Diagnostics training course: <br /> ISD PC Setup Tool,V-R PIN 332333-001 (requires a laptop with the appropriate cabling to make <br /> an RS 232 connection to the Veeder-Root TLS Console system) <br /> Updated 04/05/2006 <br /> 1 of 2 <br />