My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LODI
>
2500
>
2300 - Underground Storage Tank Program
>
PR0231356
>
COMPLIANCE INFO_2016-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2022 10:55:27 AM
Creation date
11/8/2018 9:36:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016-2018
RECORD_ID
PR0231356
PE
2361
FACILITY_ID
FA0003815
FACILITY_NAME
TESORO (MOBIL) 68154
STREET_NUMBER
2500
Direction
W
STREET_NAME
LODI
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
02740006
CURRENT_STATUS
01
SITE_LOCATION
2500 W LODI AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\L\LODI\2500\PR0231356\COMPLIANCE INFO.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
283
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Veeder-Root Line Leak Appliclon Guide • <br /> DPLLD Leak Test Options <br /> TESTING TLS-450 TLS-450PLUS <br /> ULTIMATE TESTING 332972-007 332972-007 <br /> RISK MANAGEMENT 332972-008 332972-OOB <br /> BASE COMPLIANCE 332972-009 332972-009 <br /> 3 GPH Included 332972-999 <br /> PLLD Precision Testing Frequencies <br /> On-Demand (D) <br /> Testing ran be initiated manually through the TLS Console. <br /> Auto (A) <br /> Tests will run repetitively until a passing test is achieved.Once a passing test is achieved,testing will stop and recommence six <br /> months from the date of the last passing test. <br /> Monthly(M) <br /> Tests will run repetitively until a passing test is achieved.Once a passing test is achieved,testing will stop and recommence the <br /> first calendar day of the next month. <br /> Repetitive (R) <br /> Tests will run repetitively according to pre-programmed time intervals. <br /> Refer to the matrix below to determine which precision testing option best meets your needs: <br /> OPTIONTESTING <br /> ULTIMATE TESTING D,M.R D,A,R <br /> RISK MANAGEMENT D,M,R D.A <br /> BASE COMPLIANCE None D,A <br /> DPLLD and PLLD Accessories and Spare Parts <br /> The following DPLLD and PLLD accessories and spare parts are available: <br /> MODEL <br /> 331014-001 SWIFTCHECK VALVE(INSTALLS IN THE PUMP'S MECHANICAL LEAK DETECTOR PORT) <br /> 847490-109 SIX INPUT PLLD INTERFACE MODULE(THROUGH-HOLE MOUNT)-REPLACEMENT ONLY <br /> 847490-110 SIX INPUT PLLD INTERFACE MODULE(SURFACE MOUNT) <br /> 330020-416 NON-VENTED SWIFfCHECK <br /> 410153-002 KIT-CHECKVALVE-HIGH <br /> 410557-001 KIT-CHECK(RELIEF VALVE <br /> 41057-002 KIT-CHECK/RELIEF VALVE-NON RELIEF <br /> Note: <br /> The through-hole mount,six input PLLD Interface Module(PM 847490-109)is for repair/replacement in existing consoles only. <br /> Spare 847490-109 modules are shipped with complete installation and programming instructions and not pre-installed in con- <br /> soles.Customers that require replacement of PLLD Interface Modules should replace like for like,i.e.through-hole mount PLLD <br /> Interface Modules for through-hole mount PLLD Interface Modules.Surface mount PLLD Interface Modules are NOT inter- <br /> changeable with through-hole mount PLLD Interface Modules. <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.