My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LODI
>
2500
>
2300 - Underground Storage Tank Program
>
PR0231356
>
COMPLIANCE INFO_2016-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2022 10:55:27 AM
Creation date
11/8/2018 9:36:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016-2018
RECORD_ID
PR0231356
PE
2361
FACILITY_ID
FA0003815
FACILITY_NAME
TESORO (MOBIL) 68154
STREET_NUMBER
2500
Direction
W
STREET_NAME
LODI
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
02740006
CURRENT_STATUS
01
SITE_LOCATION
2500 W LODI AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\L\LODI\2500\PR0231356\COMPLIANCE INFO.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
283
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• RECEIVED <br /> AN 0 3 2017 <br /> 4. TANK ANNULAR TESTING <br /> Test Method Developed By: ❑Tank Manufacturer ®Industry Standard ❑� �AL HEA TH <br /> ❑ Other(Spec) <br /> Test Method Used: ❑Pressure ®Vacuum ❑Hydrostatic <br /> ❑Other(Spec6) <br /> Test Equipment Used: Test plugs,venturi pump and gauges Equipment Resolution: 0.5%of span <br /> Tank#87 Tank#89 Tank#91 Diesel <br /> Is Tank Exempt From Testing? Oyes ® No ❑Yes ® No ❑Yes ® No <br /> Tank Capacity: 12k 12k 12k <br /> Tank Material: Steel Steel Steel <br /> Tank Manufacturer: Modem Welding Modem Welding Modem Welding <br /> Product Stored: Gasoline Gasoline Gasoline/Diesel <br /> Wait time between applying <br /> pressure/vacuum/water and 10 min. 10 min. 10 min. <br /> starting test: <br /> Test Start Time: 5:20 pm 5:20 pm 5:20 pm <br /> Initial Reading(Rt): 7"hg 7"hg 7"hg <br /> Test End Time: 6:20 pm 6:20 pm 6:20 pm <br /> Final Reading(RF): 7"hg 7"hg 7"hg <br /> Test Duration: 1 hour 1 hour I hour <br /> Change in Reading(RF-Rj): None None None <br /> Pass/Fall Threshold or Criteria: No detectable loss No detectable loss No detectable loss <br /> Test Result: ® Pass ❑Fail ® Pass ❑Fail ® Pass ❑Fail <br /> Was sensor removed for testing? ❑Yes®No ❑NA ❑Yes®No❑NA ❑Yes®No❑NA <br /> Was sensor properly replaced and <br /> verified functional after testing? ❑Yes❑No®NA ❑Yes❑No®NA ❑Yes❑No®NA <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> "Sensor functionality was not confirmed.This procedure is not part of the Secondary Containment testing scope of work". <br /> 91 & Diesel- split tanks. <br />
The URL can be used to link to this page
Your browser does not support the video tag.