My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LODI
>
2500
>
2300 - Underground Storage Tank Program
>
PR0231356
>
COMPLIANCE INFO_2016-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2022 10:55:27 AM
Creation date
11/8/2018 9:36:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016-2018
RECORD_ID
PR0231356
PE
2361
FACILITY_ID
FA0003815
FACILITY_NAME
TESORO (MOBIL) 68154
STREET_NUMBER
2500
Direction
W
STREET_NAME
LODI
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
02740006
CURRENT_STATUS
01
SITE_LOCATION
2500 W LODI AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\L\LODI\2500\PR0231356\COMPLIANCE INFO.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
283
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • RECEIVED <br /> JAN 0 3 2017 <br /> S.SECONDARY PIPE TESTING LTH <br /> Test Method Developed By: ❑ Piping Manufacturer ® Industry StandardEr ro eyzional.Hft-NT <br /> ❑ Other(Specify) UthHhf <br /> Test Method Used: ® Pressure ❑ Vacuum ❑ Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used: Test reducer boots,Nitrogen and gauges Equipment Resolution:0.5%of span <br /> Piping Run#87 Piping Run#89 Piping Run#91 Piping Run#Diesel <br /> Piping Material: Plastic Plastic Plastic Plastic <br /> Piping Manufacturer: Environ Environ Environ Environ <br /> Piping Diameter: 2" 2" 2" 2" <br /> Length of Piping Run: 100, 100, 100, 100, <br /> Product Stored: Gasoline Gasoline Gasoline Diesel <br /> Method and location of <br /> piping-run isolation: Reducer Boots/Fitdngs Reducer Boots/Finings Reducer Boots/Fiuings Reducer Boots/Fittings <br /> Wait time between applying <br /> pressure/vacuum/water and 10 minutes 10 minutes 10 minutes 10 minutes <br /> starting test: <br /> Test Start Time: 10:10 am <br /> Initial Reading(Rt): 5 psi <br /> Test End Time: 11:10 am <br /> Final Reading(RF): 5 psi <br /> Test Duration: 1 h <br /> r. <br /> Change in Reading(RF-Ri): None <br /> Pass/Fail Threshold or <br /> Criteria: No detectable Loss <br /> Test Result: 0 Pass ®Fall 0 Pass ®Fail 0 Pass ®Fall ® Pass 0 Fail <br /> Comments—(include information on repairs made prior to testing and recommended follow-up for failed tests) <br /> 87, 89, & 91-Visual failures. <br /> Unable to reach Jumper Lines–Will Need to pull Disp# 1/2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.