Laserfiche WebLink
*REQ LVED <br /> JAN 0 3 2011 <br /> 9. SPILL/OVERFILL CONTAINMENT BOXE TH <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested ❑ <br /> Test Method Developed By: ❑Spill Bucket Manufacturer ®Industry Standard ❑Professional Engineer <br /> ❑Other(Spec6) <br /> Test Method Used: ❑Pressure ❑Vacuum ®Hydrostatic <br /> ❑Other(Spec6) <br /> Test Equipment Used: Incon Sump Tester Equipment Resolution: +/-0.002" <br /> Fill Spill Box#87 Fill Spill Box#89 Fill Spill Box#91 Fill Spill Box#Diesel <br /> Bucket Diameter: 12" 12" 12" 12" <br /> Bucket Depth: 10" 10" 10" 10" <br /> Wait time between applying <br /> pressure/vacuum/water and 10 min. 10 min. 10 min. 10 min. <br /> starting test: <br /> Test Start Time: 1:12 pm 1:35 pm 2:03 pm 4:59 pm <br /> Initial Reading(RI): 3.7842 2.6658 5.0578 4.7725 <br /> Test End Time: 1:27 pm 1:50 pm 2:18 pm 5:14 pm <br /> Final Reading(RF): 3.7839 2,6655 5.0582 4.7725 <br /> Test Duration: 15 min. 15 min. 15 min. 15 min. <br /> Change in Reading(RF-RI): 0.0003 0.0003 0.0004 0.0000 <br /> Pass/Fail Threshold or +/.0.002" +/-0.002" +/-0.002" +/-0.002" <br /> Criteria: <br /> Test Result: ® Pass ❑Fall ® Pass ❑Fail ® Pass Cl Fail ® Pass ❑Fail <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />