My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LODI
>
2500
>
2300 - Underground Storage Tank Program
>
PR0231356
>
COMPLIANCE INFO_2016-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2022 10:55:27 AM
Creation date
11/8/2018 9:36:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016-2018
RECORD_ID
PR0231356
PE
2361
FACILITY_ID
FA0003815
FACILITY_NAME
TESORO (MOBIL) 68154
STREET_NUMBER
2500
Direction
W
STREET_NAME
LODI
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
02740006
CURRENT_STATUS
01
SITE_LOCATION
2500 W LODI AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\L\LODI\2500\PR0231356\COMPLIANCE INFO.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
283
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br /> S. FILL RISER CONTAINMENT SUMP TESTING JAN 0 3 2017 <br /> Facility is Not Equipped With Fill Riser Containment Sumps ❑ <br /> Fill Riser Containment Sumps are Present,but were Not Tested ❑ I=NVIRONMENTALTN <br /> Test Method Developed By: ❑ Sump Manufacturer ® Industry Standard ❑Profes.O@pPQiti <br /> ❑ Other(Spec6) <br /> Test Method Used: ❑Pressure ❑Vacuum ®Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Incon Sump Tester Equipment Resolution: +/-0.002" <br /> Fill Sump#87 Fill Sump#89 Fill Sump#91 Fill Sump#Diesel <br /> Sump Diameter: 42" 42" 42" 42" <br /> Sump Depth: 66" 66" 66" 66" <br /> Height from Tank Top to Top of 18" 18" 181, 18" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 5" 5" 5" 5" <br /> Electrical Penetration: <br /> Condition of sump prior to I testing: Good Good Good Good <br /> Portion of Sump Tested 2"above piping 2"above piping 2"above piping 2"above i in <br /> Sump Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Wait time between applying <br /> pressure/vacuum/water and 30 minutes 30 minutes 30 minutes 30 minutes <br /> starling test: <br /> Test Start Time: 1:12 pru 1:35 pin 2:03 pin 4:59 prn <br /> Initial Reading 4,1793 4.9124 6.1389 6.3962 <br /> Test End Time: 1:27 Inn 1:50 pm 2:18 put 5:14 pm <br /> Final Reading(RF): 4.1797 4.9126 6.1394 6.4120 <br /> Test Duration: 15 min. 15 min. 15 min. 15 min. <br /> Change in Reading RF-RI : 0.0001 0.0002 0.0005 0.0158 <br /> Pass/Fail Threshold or Criteria: +/.0.002" +/-0.002" +/-0.002" +/-0.002" <br /> Test Result: ®Pass ❑Fail ® Pass ❑Fail ®Pass ❑Fail ❑Pass ®Fail <br /> is there a sensor in the sump? ®Yes ❑No ®Yes ❑No ® Yes ❑No ®Yes []No <br /> Does the sensor alarm when <br /> either product or water is [IYes❑No®NA ❑Yes❑No®NA ❑Yes[]No®NA ❑Yes❑No®NA <br /> detected? <br /> Was sensor removed for testing? ®Yes❑No❑NA ®Yes❑No❑NA N Yes❑No❑NA ®Yes❑No❑NA <br /> Was sensor properly replaced and ®yes❑No ❑ NA ®Yes❑No❑ NA ®Yes❑No❑ NA ®Yes❑No❑ NA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended ollow-up for ailed tests) <br /> Sensor functionality was not confirmed.This procedure is not part of the Secondary Containment testing scope of work <br /> Diesel Fill- Failed, need to further investigate. <br />
The URL can be used to link to this page
Your browser does not support the video tag.