My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LODI
>
2500
>
2300 - Underground Storage Tank Program
>
PR0231356
>
COMPLIANCE INFO_2016-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2022 10:55:27 AM
Creation date
11/8/2018 9:36:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016-2018
RECORD_ID
PR0231356
PE
2361
FACILITY_ID
FA0003815
FACILITY_NAME
TESORO (MOBIL) 68154
STREET_NUMBER
2500
Direction
W
STREET_NAME
LODI
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
02740006
CURRENT_STATUS
01
SITE_LOCATION
2500 W LODI AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\L\LODI\2500\PR0231356\COMPLIANCE INFO.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
283
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S. FILL RISER CONTAINMENT SUMP TESTING <br /> Facility is Not Equipped With Fill Riser Containment Sumps ❑ <br /> Fill Riser Containment Sumps are Present,but were Not Tested ❑ <br /> Test Method Developed By: ❑Sump Manufacturer ®Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑vacuum ®Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Incon Sump Tester Equipment Resolution: +/-0.002" <br /> Fill Sump MDiesel <br /> Sump Diameter: 42" <br /> Sttm Depth: 66" <br /> Height from Tank Top to Top of 1 g„ <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 5„ <br /> Electrical Penetration: <br /> Condition of sump prior to Good <br /> testing: <br /> Portion of Sump Tested 2"above piping <br /> Sump Material: Fiberglass <br /> Wait time between applying <br /> pressure/vacuum/water and 30 minutes <br /> starting test: <br /> Test Start Time: 10:05 am <br /> Initial Reading(Rj: 4.0476 <br /> Test End Time: 10:20 am <br /> Final Reading(RP): 4.0476 <br /> Test Duration: 15 min. <br /> Change in Reading(RF-RI); 0.0002 <br /> PassNO Threshold or Criteria: +/_0.002" N <br /> Test Result: ®Pass ❑Fail DE <br /> Is there a sensor in the sump? ®Yes ❑No <br /> Does the sensor alarm when <br /> either product or water is ❑Yes❑No®NA <br /> detected? <br /> Was sensor removed for testing? IR Yes❑No❑NA <br /> Was sensor properly replaced and ®Yes❑No❑ NA <br /> verified functional after testing? <br /> CommentS— (include information on repairs made prior to testing, and recommended follow-up forfailed tests) <br /> Sensor functionality was not confirmed.This procedure is not part orthe Secondary Containment testing scope of work <br /> Made adjustments to band clamps in diesel Fill Sump. <br />
The URL can be used to link to this page
Your browser does not support the video tag.