Laserfiche WebLink
4. Provide lifting lugs on the tanks. Ings shall be capable of <br /> withstanding weight of tank with safety factory of 3:1. <br /> 5. Tank shall be manufactured with tank bottom deflector plates under <br /> manways and fittings. <br /> 6. Tank shall be manufactured with a fiberglass reservoir to he used <br /> top. <br /> for tank - leak monitoring, integrally constructed to the tank <br /> 7. Tank shall be provided with a piping sump, Madel PS 42 for leak <br /> monitoring of the double wall supply piping. <br /> H. swing joints shall be built using two 90 degree elbows and one <br /> shoulder nipple or shall be provided by petroleum hose. <br /> I. Vent pipes shall have continuous pitch back to the tank. <br /> J. Tank shall be equipped with an Owens Corning hydrostatic tank <br /> monitoring system. <br /> 1. The contractor shall provide all the components for a full <br /> operating system except for the conduit and wiring. Conduit and <br /> wiruxJ and final wiring connections shall be furnished and <br /> installed by the Electrical Contractor. <br /> a. This Contractor shall coordinate the placement and installa- <br /> tion of monitoring system components with the Electrical <br /> Contractor. <br /> b. This Contractor shall provide the Electrical Contractor with <br /> the necessary wiring di <br /> the monitoring systems. agrams for the proper installation of <br /> 2. The system installation shall be supervised by the tank installer <br /> and tested by the tank installer. The tank installer shall verify <br /> that the system is installed and operates according to the current <br /> Owens Corning installation instruction (OCF Publications <br /> 3-PE-6304, 3-PE-1281 and 3-PE-13606) provided with the tanks and <br /> sensors. <br /> 3. Hollow spheres shall be provided and installed in the reservoir. to <br /> minimize evaporative losses. <br /> 4. Reservoir sensor shall be an Owens Corning Model RS-10. <br /> a. Top cap and fitting shall be PVC, with vent holes. <br /> e <br /> b. Lead cable shall be 120" long minimum. <br /> f <br /> 15.11-7 <br /> Food Plant Engineering, Inc. <br />