My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1992
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
2650
>
2300 - Underground Storage Tank Program
>
PR0232573
>
INSTALL_1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 11:53:13 AM
Creation date
11/8/2018 9:39:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1992
RECORD_ID
PR0232573
PE
2361
FACILITY_ID
FA0003941
FACILITY_NAME
ORCHARD SUPPLY HARDWARE #1570
STREET_NUMBER
2650
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
21307061
CURRENT_STATUS
02
SITE_LOCATION
2650 MACARTHUR DR STE A
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MACARTHUR\2650\PR0232573\INSTALL 1992.PDF
QuestysFileName
INSTALL 1992
QuestysRecordDate
8/2/2017 4:00:35 PM
QuestysRecordID
3544491
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• � <br /> 4) Alarm Reports <br /> Lova fuel, high fuel, high water and <br /> product loss. <br /> A <br /> 5) utomatic pass/fail analysis <br /> Teak Detect Test RepOrt - <br /> based on leak detect criteria in 15.11.10.F.3.f above. <br /> d. Number Of probe Inputs - 1 to S. <br /> e. Auxiliary Inputs - 8 relay closures (normally closed) 24 VDC, <br /> 12 Ma. <br /> f, Auxiliary Outputs - 4 relay closures provided for remote <br /> audible and/or visual alarms' <br /> g• Remote nication ports - Two (2) EIA RS232C Serial <br /> interface ports- of the Mechani- <br /> 2. The panel installation shall be the resPonsrbility <br /> The pal shall be UL listed, pre-as q shall be <br /> cal. Contractor. Power sou IS The panel housi.ngtions and <br /> ready to where oin al20V AC ccordance with manufacturer's rec <br /> wall mounted <br /> supplied hardware• al connections <br /> schedule shall relate the terrain (AI) and <br /> a The thisfollowingel's probe inputs (PI) , auxiliary inputs for this outputs (AO) : <br /> auxiliary <br /> 1) PROBE 0731- <br /> pI-1: Tank 1 <br /> 2) AUXILIARY INPUTS <br /> AI-1: Tank 1 Sump Sensor <br /> AI-2: Tank 1 NYd�tatic Sensor <br /> 3) AUXILIARY Wr9JTS <br /> Q WXf atX /laX�$that remains f <br /> L� AO-2: Visual alarm X� 00 <br /> 00 cjr <br /> ,it when audibhorn le is <br /> asilend-5 <br /> AO-3: Audible alarm <br /> AO-4: SpaYe <br /> 3. Wiring and Cable <br /> cable shall be the Mechanical Contractor's <br /> for providing, installing aril terminating• <br /> a All wiring and stem manufac- <br /> responsibility shall be in accordance with the system ties <br /> installations manual so as to not void any warranties <br /> turer's installation <br /> and the National Electric code. <br /> 0 Deleted AO-1 line aodified A0-2 line. <br /> January 7, 1991, Add <br /> #M <br /> 15.11-10 <br /> Food plant Engineering, ° <br />
The URL can be used to link to this page
Your browser does not support the video tag.