Laserfiche WebLink
c. Ire level swig <br /> steal stainless d, 1 be <br /> �� level Switch <br /> wit steel <br /> e. <br /> contacts. ch shall be flet conductivity Probes. <br /> hag switcf7es shall switch with normally closed <br /> be in <br /> K Tan1cf. All electrical <br /> 1 1 cO 'onents shall Perforated plastic <br /> and Pi � and <br /> 1� byF the monitank ory lister N 4X. <br /> L. The tank start up shall be by a thecturor'S re tes�tallation <br /> monitor sShallm be eqUiPPed with <br /> i 'k manufact�rtsverea�mo�t r� <br /> 1. The th an entative. <br /> fully M cal. Cont cto AUtOStik Series 950 tank <br /> r', W sttallatio t'u'g• system r shall e 2bis Provide <br /> all <br /> ated foOUse of e AutY AC panel to include a cOmponents fo <br /> Lc wir, this system Wir n the -respons�i a <br /> t1Ojg allinclud� r"m th A the <br /> X11 nem litY for <br /> All s' be 422 Autostik nsd grid A-5 <br /> Aut��nduit 2thin <br /> e respoiRS 232 co ' u�atlend deviuit asst <br /> Contract Panel to for the ty °f M ) c s. <br /> r s e L)C wi the <br /> Autostiko ' re-SponsibilidevIces shall17Ing of theUcal�O tra rl�sPoit�a- <br /> WunsgsibilitYl asall be e 120 V ACalso be the t from the <br /> He delinE,t Build' pow' conn echanical <br /> 2. The mall coprd nate ewdi On the El Electrical <br /> connect. <br /> to the <br /> urerea tMan hsrion Shall },e th the Mecl�anica]ectr1construOtion <br /> 3. The foil iZed represen�ervis� Contractor. <br /> Aut O1Q- is hive, � tested <br /> ostik Proms iand asa tank Probe by a system <br /> �ciat <br /> —BW AOD —� � sensors rs schedule with notes for the <br /> -InqwSENSOgS MOlgg�GVEL PIPING a <br /> (See Tank 1 Waste OlSUMz <br /> d S g TATIC <br /> notes on follow• � IS-3 � SENSOg <br /> Page.) IS-10 <br /> W' <br /> y/ <br /> 15.11-g <br /> Food Plant <br /> Inc, <br />