Laserfiche WebLink
NOTES: <br /> J All tank level monitoring probes shall be of <br /> model <br /> compatible with product type listed above, probe length allb e <br /> capable <br /> compatible <br /> proud the tank submitted. The probe installed must be <br /> ng aocu-racy ratings as follows: <br /> Fuel Measurement - <br /> .001 inches <br /> Leak Detect Sensitivity - .05 <br /> 9a1/hr with a 95% <br /> probability of detection and <br /> less than a 5% probability of a <br /> false alarm. <br /> Fuel Temperature _ <br /> 1.05 degree F. <br /> Probe material shall be aluminum and stainless steel. Float <br /> material shall be Nytrophyl. <br /> installation incl Proms shall come complete for <br /> drat, t including Series 950 4" brass adapter and 950 cover. <br /> J emperature shall be 40 degree F. to 330 degrees F. <br /> J similar evice The hydrostatic reservoir shall include hollow spheres or a <br /> Vaporize losses.pided and installed in the reservoir to minimize <br /> J Waste oil tank oneeds to be Programmed initially for high level <br /> alarm at 400 <br /> s. <br /> J All systems/device must <br /> be NEMA 4X. be UL listed. Electrical conponents shall <br /> M. Electronic Tank Monitor Panel <br /> I. The Contractor shall provide one, EBW, AutOStik electronic tank <br /> monitor #950413 panel. This panel shall be located at Grid A-5 in <br /> the Warehouse. This panel shall include, but not be limited to: <br /> a. Alpha-Numeric LCD Display - Two lines, 24 characters per line. <br /> b. Standard guilt-in Printer with thermal paper - 2-1/4" wide x <br /> j 150' 924 characters wide) , <br /> C. Report printouts - All reports to be time/dated. <br /> J <br /> 1) in gall <br /> Shift Reser - Includes an inventory report and net change <br /> 2) Inventory Report - <br /> By simply <br /> Iushing PRINT. <br /> 3) Product Increase Report - Including last six increases. <br /> ) <br /> 15.11-9 <br /> Food Plant Engineering Inc. <br />