My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1490
>
2300 - Underground Storage Tank Program
>
PR0541436
>
INSTALL 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 1:59:23 PM
Creation date
11/8/2018 9:40:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2018
RECORD_ID
PR0541436
PE
2351
FACILITY_ID
FA0023750
FACILITY_NAME
AGS FUEL INC DBA CIRCLE K CHEVRON
STREET_NUMBER
1490
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
1490 S MAIN ST
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\M\MAIN\1490\PR0541436\2018 INSTALL.PDF
QuestysFileName
2018 INSTALL
QuestysRecordDate
5/2/2018 6:57:48 PM
QuestysRecordID
3878462
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
501
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TANKTESTING <br /> 5.3.1. Comply with the requirements of Section 4. 5.3.14. Observe and monitor the gauge on the <br /> 5.3.2. Connect"TankTest Manifold"to a primary tank annular space for 30 minutes for any loss <br /> fitting. of pressure which may indicate a leak. <br /> 5.3.3. Connect hose between a primary tank fitting 5.3.15. While under pressure,cover tank outer <br /> and"Annular Space Gauge and Valve" surface,including fittings and manway(s) <br /> 5.3.4. Close valve between primary tank and annular with soap solution and inspect. <br /> space. 5.3.16. After completing air test,release pressure. <br /> 5.3.5. Connect the pressure source to the"TankTest 5.3.17. Remove all gauges,valves,and hose <br /> Manifold"on the main tank. assemblies. <br /> 5.3.6. Pressurize primary tankto 5 psig maximum 5.3.18. Replace and tighten fitting plug(s). <br /> (3 psig for 12'tanks) (see Figure 5-2). 5.3.19. Replace the plastic vent plugs in the <br /> Figure 5-2 open fittings. <br /> Air Supply Hose 5.4. Te"tin Double-Wall Com artment <br /> PrimaryTank Valve Closed Tanks With A Dry Annular Space And <br /> Fitting Double-Wall Bulk eadt <br /> Annular Space <br /> Fitting Annular Space <br /> 5 psig Do not connect the air supply directly to the annular <br /> (3 prig for 12'tanks) space monitoring fitting or tank damage will result. <br /> Primary Tank <br /> 5.4.1. Comply with the requirements of Section 4. <br /> 5.3.7. Close the air supply valve to the primary tank. 5.4.2. Connect"TankTest Manifolds"to each <br /> 5.3.8. Disconnect the air supply. compartment. <br /> 5.3.9. Open valve between primary tank and annular 5.4.3. Connect hose between a primary tank fitting <br /> space in order to pressurize the annular space and"Annular Space Gauge and Valve" <br /> using the existing pressure in the primary tank (refer to Figure 5 2). <br /> (pressure in the primary tank may drop 5.4.4. Close valve between primary tank and annular <br /> slightly) (see Figure 5-3). space. <br /> Figure 5-3 5.4.5. Connect the pressure source to the "Tank Test <br /> Manifold"on each compartment. <br /> Valve Closed Hose Valve Open 5.4.6. Pressurize all compartments to 5 psig <br /> Primary Tank <br /> Fitting Annular Space (3 psig for 12'tanks) (see Figure 5-5). <br /> Annular Space <br /> Fitting 5psig Figure 5-5 <br /> (3psgforl2'tanks) <br /> Air Supply Air Supply Air Supply <br /> Valve Closed <br /> 5 psig <br /> (3 psig for 12'tanks) Q O <br /> Primary Tank <br /> 5.3.10. While under pressure,cover fittings and 5 sig <br /> manway(s),with soap solution and inspect. 5 psig 5 prig <br /> 5p <br /> sig <br /> 5.3.11. Close valve to annular space. F*tension Extension <br /> Main <br /> 5.3.12. Open valve to vent primary tank. <br /> 5.3.13. Maintain pressure on the annular space 5.4.7. Close valve on each compartment"Tank Test <br /> F <br /> (see Figure 5-4Manifold"Disconnect the air supply line. <br /> Figure 5-a 5.4.8. Monitor the pressure for 30 minutes for any <br /> Valve Open "O� �yalve Closed loss in pressure from the initial reading which <br /> Fitting <br /> PrimaryTank / P 9 <br /> Annular Space may indicate a leak. <br /> Fitting 5psig <br /> Annular pace 5.4.9. With all compartments under pressure,cover <br /> (3psi9mr 12'tanks) fittings and manway(s)with soap solution and <br /> inspect. <br /> 5.4.10. Open valve between primary tank and annular <br /> space in order to pressurize the annular space <br /> using the existing pressure in the primary tank <br /> (pressure in the primary tank may drop slightly). <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.