My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1490
>
2300 - Underground Storage Tank Program
>
PR0541436
>
INSTALL 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 1:59:23 PM
Creation date
11/8/2018 9:40:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2018
RECORD_ID
PR0541436
PE
2351
FACILITY_ID
FA0023750
FACILITY_NAME
AGS FUEL INC DBA CIRCLE K CHEVRON
STREET_NUMBER
1490
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
1490 S MAIN ST
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\M\MAIN\1490\PR0541436\2018 INSTALL.PDF
QuestysFileName
2018 INSTALL
QuestysRecordDate
5/2/2018 6:57:48 PM
QuestysRecordID
3878462
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
501
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TANKTESTING <br /> 5. TIESTINGTANKS 5.2.1.2. Vacuum monitored tanks must be under <br /> 5.1. Testing Single-Wall Tank(s) minimum vacuum for at least 7 days.If <br /> 5.1.1. Comply with the requirements of Section 4. this requirement is not met,and air/soap <br /> P Y q test is required (see Section 4).The date <br /> 5.1.2. Con nect"Tank Test Manifold"to a tank fitting. the vacuum was applied to the tank is <br /> 5.1.3. Connect the pressure source to the"Tank Test located on or near the vacuum gauge. <br /> Manifold" 5.2.1.3. Upon arrival of the tank at the job-site, <br /> 5.1.4. Pressurize tank to 5 psig maximum the contractor must record the vacuum <br /> (3 psig for 12'tanks)(see Figure 5-1). date,the arrival date,and the vacuum <br /> level from the gauge.This should be <br /> Figure 5-1 done while the tank is on the truck or <br /> Air Supply immediately after off loading. <br /> 5.2.1.4. A tank shipped under vacuum can be <br /> installed and backfilled with the vacuum <br /> intact if both of the following conditions <br /> are met: <br /> • The vacuum date precedes the tank <br /> C: 5 psig installation by at least 7 days. <br /> (3p5i9f0T12'WnW • The vacuum gauge reads at least <br /> 10"Hg (34kPa). <br /> 5.2.1.5. If the tank installation date is 7 days <br /> or less from the vacuum date OR if the <br /> 5.1.5. Close the air supply valve to the primary tank. vacuum level is less than 10"Hg,the <br /> 5.1.6. Disconnect the air supply. vacuum on the annular space must be <br /> released and both the primary tank <br /> 5.1.7. Monitor the pressure readings for 30 minutes and the secondary tank must be tested <br /> for any loss in pressure from the initial reading for tightness before installation and <br /> which may indicate a leak. backfilling. <br /> 5.1.8. While under pressure,cover tank outer surface, 5.2.1.6. If the tank installation date is more than <br /> including fittings and manway(s),with soap 7 days from the vacuum date and the <br /> solution and inspect. vacuum level is at least 10"HG,the tank <br /> 5.1.9. After completing air test,release pressure. may be backfilled to the tank top while <br /> 5.1.10. Remove all gauges,valves,and hose assemblies. holding vacuum on the annular space. <br /> 5.1.11. Replace and tighten fitting plug(s). 5.2.2. After backfilling to tank top <br /> 5.1.12. Replace the plastic vent plugs in the open 5.2.2.1. Pressurize only the primary tank and <br /> fittings. all compartments while maintaining <br /> 5.1.13. Refer to INST 6038 for procedure to remove vacuum on the annular space.Cover <br /> factory equipped on-site pressure test fittings and manway(s)with soap solution <br /> and inspect. <br /> components. 5.2.2.2. In the unlikely event a tank leak is <br /> 5.2. Double-Wall Tanks Shipped Under discovered,discontinue the installation <br /> Vacuum and immediately call CSI Field Services to <br /> schedule a repair. <br /> 5.2.2.3. After the soap test is complete,release <br /> Vacuum monitoring is less sensitive and less reliable the pressure on the primary tank,release <br /> the vacuum on the annular space and <br /> than the air/soap test. Several variables can affect <br /> the accuracyof vacuum monitoring including removethehe anularspacuge,and egaing.uge piping <br /> g g and seal the annular space fitting. <br /> environmental conditions(e.g.temperature,pressure, 5.2.2.4. If the vacuum level is ever less than <br /> altitude)and/or equipment failure. 10' <br /> 'H g,immediately call CSI Field Services. <br /> 5.2.1. Pre Installation 5.3. Testing Double-Wall Tank(s) <br /> 5.2.1.1. CSI double-wall tanks may be shipped With Dry Annular Space <br /> from the factory with the annular space <br /> under vacuum.The vacuum serves to <br /> confirm the integrity of the primary <br /> and secondary(outer)walls prior to [Do not connect the air supply directly to the annularshipment,during shipment,handling, ace monitoring fitting or tank damage will result. <br /> and off loading.This option may expedite <br /> tank installation by minimizing testing <br /> procedures. <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.