My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1490
>
2300 - Underground Storage Tank Program
>
PR0541436
>
INSTALL 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 1:59:23 PM
Creation date
11/8/2018 9:40:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2018
RECORD_ID
PR0541436
PE
2351
FACILITY_ID
FA0023750
FACILITY_NAME
AGS FUEL INC DBA CIRCLE K CHEVRON
STREET_NUMBER
1490
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
1490 S MAIN ST
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\M\MAIN\1490\PR0541436\2018 INSTALL.PDF
QuestysFileName
2018 INSTALL
QuestysRecordDate
5/2/2018 6:57:48 PM
QuestysRecordID
3878462
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
501
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br /> FEB 16 2017 <br /> - � <br /> 'L HEALTH <br /> EQUIPMENT DRY-FIT DEPART NT <br /> - BEFORE INSTALLING PENETRATION FITTINGS <br /> - BEFORE CUTTING OPEN SUMP INTERSTICE <br /> DRY-FIT YOUR SUMP PIECES AND INTERNAL EQUIPMENT. <br /> BEFORE PENETRATING FIBERGLASS <br /> ARNING WALLS ENSURE THAT THE DOUBLE WALL FRP <br /> SUMP IS HOLDING VACUUM <br /> • It is REQUIRED to visually check the Vacuum gauge on each and <br /> every BravoSystems Double Wall product and write on its packaging <br /> report Vacuum level, signature of observer, date and time the <br /> shipment is received at every destination. <br /> WARRANTY IS VOID : <br /> IF ANY OF THE FOLLOWING OCCUR <br /> A) There is a failure to comply with the Required written report guidelines as stated above. <br /> B) Double Wall Products are DOUBLE-STACKED, stored or shipped in a negligent way. <br /> Ci) There is a failure to handle Bravo Systems equipment with the utmost care. <br /> D) Any packaging or wrapping materials are removed before the item reaches It's destination. <br /> E) Double Wall Sump Products, Failure to call Bravo Systems If Vacuum level on product is <br /> less than 12" HG (Vacuum) (323) 888-4133, refer to sump for further details. <br /> F) If there is any indication or suspect damage, you must mark the freight paperwork <br /> "Suspect Freight Damage" <br /> 3 ii-B8000-9000-DW-11B <br />
The URL can be used to link to this page
Your browser does not support the video tag.