My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1490
>
2300 - Underground Storage Tank Program
>
PR0541436
>
INSTALL 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 1:59:23 PM
Creation date
11/8/2018 9:40:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2018
RECORD_ID
PR0541436
PE
2351
FACILITY_ID
FA0023750
FACILITY_NAME
AGS FUEL INC DBA CIRCLE K CHEVRON
STREET_NUMBER
1490
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
1490 S MAIN ST
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\M\MAIN\1490\PR0541436\2018 INSTALL.PDF
QuestysFileName
2018 INSTALL
QuestysRecordDate
5/2/2018 6:57:48 PM
QuestysRecordID
3878462
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
501
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br /> NEW INSTALLATION FEB 162017 <br /> ■ . During Installation,cover the Unlaoz with cardboard,plastic she It� t `h� 1Aktq�k�eA� HEALTH <br /> debris from falling into the boz.Cover all threaded connections t r� a to t rea 5. <br /> DE AHTMENT <br /> A - Sump Positioning Fig. A.1 <br /> Anchor bo\ts--� Upper <br /> A.1- Determine the permanent position of the UniBox frame <br /> inside the island according to your specs. Place two <br /> support bars across the island widthwise. (Fig.A.1) <br /> A.2- Rest UniBox on top of a bed of peagravel and <br /> ensure the UniBox is level.The Angled supports should Mid-frame <br /> make contact with the support bars of the island (Fig.A.1). <br /> �� Angled <br /> Containment boxes are marked "A" for Supports SwE <br /> Junction box side. Refer to dispenser manufacturers r,A„ <br /> Junction box position. <br /> " Box should be approximately 114" <br /> above top edge of island to allow water to drain away <br /> from containment box. <br /> A.3 -After positioning dispenser box, secure with tie <br /> Bars <br /> wire to the island support to prevent shifting during Sup,pOY1. <br /> concrete pour. Bolting angled supports to the support bars <br /> through provided 1/4" holes is recommended. (Fig.AA) <br /> PRODUCT AND VAPOR Fig. AA <br /> SHEAR VALVE Product and Vapor <br /> Shear Valves <br /> A.4 - Remove top frame. If not factory installed, connect <br /> either the flex connector and/or riser pipe to the bottom of Support <br /> the shear valves outside the sump, then install all product Bars <br /> and vapor shear valve assemblies according to the <br /> dispenser configuration to the provided brackets. If <br /> adjustments to the position of the shear valves are <br /> required, check with dispenser manufacturer's <br /> configuration (Fig.A.4). See also "Section D" on page 8. hH s <br /> m <br /> • dVa or eheUeHon <br /> A.5 - PRIOR TO CUTTING OPEN Flo <br /> ducta <br /> DISPENSER SUMP ENSURE THAT <br /> THE SUMP IS HOLDING VACUUM. <br /> READ PAGE 4 & 5 CAREFULLY H! <br /> If the gauge reads at or ABOVE 12 INCHES OF Primary and Secondary piping <br /> MERCURY at this time, break vacuum and 1/4" Perforations <br /> proceed to Step A.6. <br /> p± Pressure test the primary <br /> If the gauge reads BELOW 12 INCHES OF line line following the pipe <br /> MERCURY at this time CONTACT THE manufacturer's Installation Instructions. Refer to shear valve <br /> FACTORY AT 323-888-4133. manufacturer's Installation Instructions for details on testing. <br /> Follow Step B.2 to repair leaks. <br /> 4 ii-88000-9000-DW-11 B <br />
The URL can be used to link to this page
Your browser does not support the video tag.