My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1490
>
2300 - Underground Storage Tank Program
>
PR0541436
>
INSTALL 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 1:59:23 PM
Creation date
11/8/2018 9:40:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2018
RECORD_ID
PR0541436
PE
2351
FACILITY_ID
FA0023750
FACILITY_NAME
AGS FUEL INC DBA CIRCLE K CHEVRON
STREET_NUMBER
1490
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
1490 S MAIN ST
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\M\MAIN\1490\PR0541436\2018 INSTALL.PDF
QuestysFileName
2018 INSTALL
QuestysRecordDate
5/2/2018 6:57:48 PM
QuestysRecordID
3878462
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
501
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
htutivtu <br /> FEB 16 2017 <br /> While Fiberglassing, curing, or sitting overnight, KeeRMOR_NTAL HEALTH <br /> SVA-BARB in place. This will relieve stress on the Ini-SENT <br /> while the sumps are heating up or cooling off. <br /> SAVE THESE PIECES, DO NOT LOSE THEM! Remove the SVA-BARB when ready to test. <br /> y <br /> fVT <br /> MaiL' <br /> Gauge CAP <br /> SVA-BARB <br /> Assembly <br /> PRIMARY LINE PENETRATION FITTINGS <br /> A.6 - Install all the required number of doublewall penetration fittings per their respective <br /> Installation Instructions (Fig. A.4). <br /> DO NOT FILL DOUBLE WALL PENETRATION <br /> FITTINGS WITH FOREIGN MATERIALS, SEALANTS or ADHESIVES! <br /> ELECTRICAL FITTINGS & CONDUITS <br /> A.7 - Next generation Bravo UDC's feature an electrical offset frame that allows you to install your <br /> conduits on the exterior of the sump and up into the side panel of your dispenser. <br /> A.8 - Following your installation of the doublewall penetration fittings, you must <br /> FIRST TEST THE INTEGRITY OF THE BOX, SINCE THE INITIAL VACUUM HAS BEEN LOST. <br /> A.9 - Using the factory-provided & installed pressure/vacuum combination gauge, Pressure the <br /> sump to 4 PSI and soap ALL fittings, and any field repairs, inside and outside. If foaming leaks are <br /> found, Skip to Step B.2. <br /> PRIMARY AND SECONDARY PIPING <br /> A.10 - Please refer to your pipe manufacturer's Installation Instructions. <br /> A.11 - When finished with the installation of pipe lines, pressure sump again to no more than 4 <br /> PSI and soap all penetration fittings, inside and outside. Again, if leaks are found, skip to Step B.2 <br /> F1a <br /> S. Bravo Systems, Inc. Highly recommends the Air <br /> i AN <br /> Integrity Test (Step B.1) to be completed at this time, after <br /> the penetration fittings have been installed correctly. <br /> 5 ii-B8000-9000-DW-11B <br />
The URL can be used to link to this page
Your browser does not support the video tag.