My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1490
>
2300 - Underground Storage Tank Program
>
PR0541436
>
INSTALL 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 1:59:23 PM
Creation date
11/8/2018 9:40:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2018
RECORD_ID
PR0541436
PE
2351
FACILITY_ID
FA0023750
FACILITY_NAME
AGS FUEL INC DBA CIRCLE K CHEVRON
STREET_NUMBER
1490
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
1490 S MAIN ST
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\M\MAIN\1490\PR0541436\2018 INSTALL.PDF
QuestysFileName
2018 INSTALL
QuestysRecordDate
5/2/2018 6:57:48 PM
QuestysRecordID
3878462
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
501
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br /> Fame �1'r, <br /> I E <br /> FEB 16 2017 <br /> D) ATTACHING THE MANOM EETERENTAL HEALTH <br /> DEPARTMENT <br /> DA -At this point, after the ALDP test, the interstice should still be holding vacuum. Maintain 20" of <br /> Vacuum and slowly open ball valve to let fluid into the interstice until it exits the venturi assembly. <br /> Visually check whether the fluid level reaches the top of the interstitial space. <br /> OD.2 - Cut the barb & ball valve assembly free by cutting the <br /> tubing just below it and connect open end of tubing to the <br /> bottom of the primary Manometer. <br /> 0 <br /> Q D.3 - Cut the Tee and Gauge assembly free by cutting the <br /> tubing just below it and connect open end of tubing to the <br /> bottom of the atmospheric manometer. adjust atmospheric <br /> manometer bracket so the manometer is in a position clear of <br /> obstructions. <br /> DA - It is not uncommon for some interstitial fluid to be lost <br /> while connecting the tubing to the primary manometer. This is <br /> ok. Replace lost fluid by topping off manometer with interstitial <br /> Cut off barb fluid until the liquid level reaches just 2 inches below the top <br /> & ball valve of manometer. <br /> assembly D.5 - Hydrostatic Field Integrity Test <br /> Mark the date and time of test and manometer level. Allow 1 hour <br /> to look for a change in level. No change in level or visible leaking <br /> means box passes test. <br /> D.6 - If interstitial test fluid changes its level more than 1/4°, <br /> visually look for any signs of leaking around fittings both interior and <br /> exterior to sump. Pay special attention to field installed fittings. <br /> NOTE; If you have completed the Air Integrity Test without <br /> problems, and completed the Vacuum Hydrostatic Method of <br /> filling and still have problems with sump integrity, Contact the <br /> `m Factory. <br /> s <br /> a <br /> cno Ec <br /> E c m D.7 - If interstitial monitoring is required, install a California Listed <br /> ca Q <br /> a Hydrostatic Sensor (LG-113) using the sensor manufacturer's fitting. <br /> Run the sensor cable through the cap assembly. The electronic <br /> liquid level sensor should be set at the bottom of the primary (larger) <br /> manometer reservoir. Follow your leak detector manufacturer's <br /> installation instructions. Cover the manometer with cap and fasten <br /> tinstalled <br /> ronic liquid with wire and lead crimp seal. <br /> l sensor is <br /> inside P-Traps OK since vacuum fill method leaves no room for air. <br /> manometer <br /> 11 ii-B8000-9000-DW-11B <br />
The URL can be used to link to this page
Your browser does not support the video tag.