My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1490
>
2300 - Underground Storage Tank Program
>
PR0541436
>
INSTALL 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 1:59:23 PM
Creation date
11/8/2018 9:40:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2018
RECORD_ID
PR0541436
PE
2351
FACILITY_ID
FA0023750
FACILITY_NAME
AGS FUEL INC DBA CIRCLE K CHEVRON
STREET_NUMBER
1490
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
1490 S MAIN ST
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\M\MAIN\1490\PR0541436\2018 INSTALL.PDF
QuestysFileName
2018 INSTALL
QuestysRecordDate
5/2/2018 6:57:48 PM
QuestysRecordID
3878462
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
501
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elf rED <br /> E- Upper Frame Installation FEB 162017 <br /> ENVIRONMENTAL HEALTH <br /> EA - Clean all surfaces. Apply a generous bead of <br /> provided Vulkem to the top edge of the Midframe. Be ,3600 1g• <br /> sure to apply Vulkem to the bolt holes. (Fig. E.1) Seat <br /> a <br /> E.2 - Place the dispenser frame on top of the <br /> midframe and align the holes. Secure using provided <br /> truss head screws. Apply Vulkem to threads and <br /> between parts you are bolting to.Apply Vulkem to the <br /> external gap between the midframe and upper Midframe <br /> frame. After tightening bolts and/or nuts provided and <br /> upper frame is secure, apply generous amount of <br /> vulkem to seal the nut and threads. <br /> E.3 - Loosen valve bolts on bracket to allow for <br /> adjustability for when you align dispenser and make <br /> valve connections. <br /> While it is common to bead silicone caulk or other sealant along <br /> I j the bottom edge of the dispenser paneling where it meets the <br /> island YOU SHOULD NOT DO THIS !! <br /> Bravo Systems dispenser frames and conversion frames are purpose built with a tailored Water <br /> Splash lip to prevent water from water entering the bottom seams of the dispenser and into the sump <br /> below. When you seal this edge, it will cause water from rain or heavy fog to accumulate on the inte- <br /> rior of the dispenser and, when it runs down the interior of the dispenser panels, it will accumulate <br /> between your seal and our water splash lip, and drain into the sump causing an alarm. If you MUST <br /> seal this area on the traffic-facing sides of the dispenser, we suggest leaving a 2-3" gap on the ends <br /> to allow water drainage from within. <br /> Island, UDC and Dispenser Frame installed <br /> and ready for dispenser mounting. <br /> 12 ii-B8000-9000-DW-11B <br />
The URL can be used to link to this page
Your browser does not support the video tag.