Laserfiche WebLink
Veeder-Root Line Leak Application Guide <br /> Specifications and Compatible Fluids Requirements <br /> The table below lists Veeder-Root Line Leak Detector specifications. <br /> SPECIFICATION TLS-4XX W/DPLLD TLS-350 W/PLLD TLS-350 W/WPLLD <br /> OPERATING TEMP: -25 TO+130T -25 TO+130°F -25 TO+130°F <br /> COMPATIBLE FUELS: UNLEADED GASOLINE UNLEADED GASOLINE UNLEADED GASOLINE <br /> LEADED GASOLINE LEADED GASOLINE LEADED GASOLINE <br /> 596 METHANOL/9596 UNLEADED 596 METHANOL/9596 UNLEADED 596 METHANOL/95%UNLEADED <br /> 0-10096 ETHANOL 0-10096 ETHANOL 1096 ETHANOL/9096 UNLEADED <br /> 10%ETHANOL/90%UNLEADED 1096 ETHANOL/9096 UNLEADED 1596 MTBE/8596 UNLEADED <br /> 1596 MTBE/8596 UNLEADED 15%WEE/8596 UNLEADED DIESEL <br /> DIESEL DIESEL BIODIESEL(UP TO 8100)1 R <br /> BIODIESEL(UP TO 8100)1.2 BIODIESEL(UP TO B100)1'2 KEROSENE <br /> KEROSENE KEROSENE JET FUEL <br /> JET FUEL JET FUEL AVIATION GASOLINE <br /> AVIATION GASOLINE AVIATION GASOLINE <br /> LINE FLOW RATE: 120 GPM MAX.W/SWIFTCHECK VALVE 120 GPM MAX.W/SWIFTCHECK VALVE 120 GPM MAX.W/SWIFTCHECK VALVE <br /> OPERATING RANGE: 0-70 PSI 0-70 PSI 0-70 PSI <br /> PROOF PRESSURE: 200 PSI 200 PSI 200 PSI <br /> MAX.VERTICAL PIPELINE HEIGHT 11 FEET 11 FEET 11 FEET <br /> ABOVE TRANSDUCER, <br /> MINIMUM PUMP OUTPUT PRES- 23 psi 23 psi 23 psi <br /> SURE° <br /> I Biodiesel compliant with ASTM D7467(up to B20)or ASTM D6751. <br /> 2Consuh pump manufacturer for compatibility ratings on fuel blends greater than 1320. <br /> 3Applications that exceed these max.vertical pipeline heights will require further consultation.Please contact Veeder—Root at 800-323-1799(request a <br /> Veeder—RooVRed Jacket Application Engineer). <br /> °Pump output pressure should be a minimum of 4 psi above the check valve's relief pressure. <br /> Veeder-Root recommends that system software for the console be upgraded to the latest version when installing any new hard- <br /> ware.For TLS-350 Consoles,when installing latest software,PLLD or WPLLD must be specified and customer must upgrade to <br /> ECPU2 if not already installed.See Accessories/Upgrades section of price book or your local Veeder-Root authorized distribu- <br /> tor for details. <br /> 5 <br />