My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1490
>
2300 - Underground Storage Tank Program
>
PR0541436
>
INSTALL 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 1:59:23 PM
Creation date
11/8/2018 9:40:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2018
RECORD_ID
PR0541436
PE
2351
FACILITY_ID
FA0023750
FACILITY_NAME
AGS FUEL INC DBA CIRCLE K CHEVRON
STREET_NUMBER
1490
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
1490 S MAIN ST
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\M\MAIN\1490\PR0541436\2018 INSTALL.PDF
QuestysFileName
2018 INSTALL
QuestysRecordDate
5/2/2018 6:57:48 PM
QuestysRecordID
3878462
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
501
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Veeder-Root Line Leak Application Guide <br /> MAXXUM PUMPS <br /> 1. Thread the DPLLD or PLLD transducer into the 2-inch opening of the transducer port. <br /> Seal any pipe threads using a UL-classified, nontoxic pipe sealant suitable for the fuel involved. <br /> 2. If any in-line check valves or a Big-Flo Diaphragm Valve are installed in the line,they must be removed. <br /> 3. Verify that the TLS 350 Series Console has Version x19 or later software(TLS-450 Series Consoles Version 1 or later <br /> software). <br /> Junction box Seal-off, epoxy seal per NFPA spec <br /> (customer supplied) (customer supplied) <br /> DPLLD or PLLD <br /> transducer 1 n 2" <br /> Transducer <br /> port <br /> o ® conduit to console <br /> (customer supplied) <br /> 0 <br /> o � <br /> 011 axxum.eps <br /> FE PETRO HIGH CAPACITY PUMPS <br /> 1. Install a reducing tee(customer supplied)in either of the 3-inch discharge ports of the pump with the 2-inch port facing up. <br /> 2. Thread the D/PLLD transducer into the 2-inch port on the tee fitting. <br /> Seal any pipe threads using a UL-classified, nontoxic pipe sealant suitable for the fuel involved. <br /> 3. Install a model"R"relief valve into the pump if one is not already present. <br /> 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.