My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1490
>
2300 - Underground Storage Tank Program
>
PR0541436
>
INSTALL 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 1:59:23 PM
Creation date
11/8/2018 9:40:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2018
RECORD_ID
PR0541436
PE
2351
FACILITY_ID
FA0023750
FACILITY_NAME
AGS FUEL INC DBA CIRCLE K CHEVRON
STREET_NUMBER
1490
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
1490 S MAIN ST
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\M\MAIN\1490\PR0541436\2018 INSTALL.PDF
QuestysFileName
2018 INSTALL
QuestysRecordDate
5/2/2018 6:57:48 PM
QuestysRecordID
3878462
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
501
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• � 1 <br /> 3.07 Acceptable Products - RED THREAD IIA Piping Secondary Containment Piping <br /> System as manufactured by NOV Fiber Glass Systems or <br /> engineered approved equal. SECTION 1 - Scope <br /> This section covers the use of fiberglass reinforced plastic <br /> SECTION 4 - Installation and Testina (FRP) pipe for fuel handling and fuel handling vent and vapor <br /> 4.01 Tralnina and Certification - All joints installed or applications Including gasoline, unleaded gasoline, gasoline/ <br /> constructed in the field shall be assembled by employees alcohol mixtures, blo-diesel and diesel that require secondary <br /> of the contractor who have been trained by the pipe containment. <br /> manufacturer. The pipe manufacturer or their authorized <br /> representative shall train the contractor's employees in the SECTION 2 - General Conditions <br /> proper joining and assembling procedures required for the <br /> project, Including hands-on participation by the contractor's 2.01 Coordination - Material furnished and work <br /> employees. Each bonder shall fabricate one pipe-to-pipe performed under this section shall be coordinated with the <br /> and one pipe-to-fitting joint that shall pass the minimum related work and equipment specified under other sections, <br /> pressure test for the application as stated in Section 2.03 i.e. Valves, Flexible Connectors, Equipment. <br /> without leaking. <br /> Only bonders that have successfully completed the 2.02 Governina Standards - Except as modified or <br /> pressure test shall bond pipe and fittings. Each bonder shall supplemented herein, all materials and construction methods <br /> carry a current manufacturer's proof of training card. shall comply with and be tested in accordance with the <br /> 4.02 Pipe Installation-Pipe shall be Installed as specified following standards and test methods: <br /> and Indicated on the drawings. <br /> The piping system shall be Installed in accordance with the Standards and Test Methods: <br /> manufacturer's current published installation procedures. UL971 Standard for Nonmetallic Underground Piping for Flam- <br /> 4.03 Testing - A hydrostatic pressure test shall be 2004 mable Liquids <br /> conducted on the completed piping system. The piping <br /> system shall be subjected to 10 pressurization cycles from 0 ASTM Standard Classification for Machine-Made"Fiberglass" <br /> pslg to 1.5 times the design operating pressure as stated in D2310 (Glass Fiber Reinforced Thermosetting Resin) Pipe <br /> Section 2.03.c. After the 10 cycles, the pressure shall be held ASTM Standard practice for obtaining Hydrostatic or Pressure <br /> on the system for a minimum of 1 hour and the line Inspected D2992 Design Basis for"Fiberglass" (Glass Fiber Reinforced <br /> for leaks. Thermosetting Resin)Pipe and Fittings <br /> Test pressures shall not exceed 1,5 times the maximum <br /> rated pressure of the lowest rated element in the system. 2.03 Operatina Conditions - In addition to the above <br /> All pipe joints shall be water tight. All joints that are found listed minimum design requirements, the system shall meet <br /> to leak, by observation or during testing, shall be replaced by the following minimum operating conditions: <br /> the contractor and retested. a. Operating Pressure <br /> Should hydrostatic testing be Impractical, testing with b. Fluld Conveyed <br /> low pressure air or Inert gas may be acceptable. Extreme c. Test Pressure <br /> caution should be used when testing with air. Follow all <br /> safety precautions and testing recommendations of the pipe 2.04 Quality Assurance - Pipe manufacturer's quality <br /> manufacturer. program shall be in compliance with ISO 9001 and/or API O1. <br /> 2.05 Delivery. Storage. and Handling - Pipe and fittings <br /> shall be protected from damage due to Impact and point <br /> loading. Pipe shall be properly supported to avoid damage <br /> due to flexural strain. The contractor shall not allow dirt, <br /> debris or other extraneous materials to get Into pipe and <br /> fittings. All factory machined areas shall be protected from <br /> sunlight until installed. <br /> 2.06 Acceptable Manufacturers - NOV Fiber Glass <br /> Systems, 501-568-4010, or approved equal. <br />
The URL can be used to link to this page
Your browser does not support the video tag.