My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1490
>
2300 - Underground Storage Tank Program
>
PR0541436
>
INSTALL 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 1:59:23 PM
Creation date
11/8/2018 9:40:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2018
RECORD_ID
PR0541436
PE
2351
FACILITY_ID
FA0023750
FACILITY_NAME
AGS FUEL INC DBA CIRCLE K CHEVRON
STREET_NUMBER
1490
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
1490 S MAIN ST
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\M\MAIN\1490\PR0541436\2018 INSTALL.PDF
QuestysFileName
2018 INSTALL
QuestysRecordDate
5/2/2018 6:57:48 PM
QuestysRecordID
3878462
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
501
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4W . <br /> Section 3 - Material and Construction 3.06 Adhesives - Adhesives shall be manufacturer's <br /> 3.01 2"-4"Primary&3"-6" Secondary Pipe-The pipe standard for the piping system specified. <br /> shall be manufactured by the filament winding process using <br /> an amine cured epoxy thermosetting resin to impregnate 3.07 Acceptable Products - RED THREAD IIA Piping <br /> strands of continuous glass filaments, which are wound System as manufactured by NOV Fiber Glass Systems or <br /> around a mandrel at a 543/4"winding angle under controlled engineered approved equal. <br /> tension. The pipe shall be heat cured and the cure shall be <br /> confirmed using a Differential Scanning Calorimeter. SECTION 4 - Installation and Testina <br /> Pipe shall be supplied with T.A.B. (Threaded and Bonded)or <br /> plain ends. 4.01 Training and Certification - All Joints Installed or <br /> constructed in the field shall be assembled by employees <br /> Pipe shall have a minimum continuous cyclic pressure of the contractor who have been trained by the pipe <br /> rating of 125 psig at 150°F In accordance with ASTM D2992, manufacturer. The pipe manufacturer or their authorized <br /> Procedure A or UL 971 pressure rating. representative, shall train the contractor's employees In the <br /> All pipe, both primary and secondary, shall be 100% proper joining and assembling procedures required for the <br /> hydrotested at the factory before shipment at a minimum project, including hands-on participation by the contractor's <br /> pressure of 265 psig and shall be UL 971-2004 Listed and employees. Each bonder shall fabricate one pipe-to-pipe <br /> Labeled. and one pipe-to-fitting Joint that shall pass the minimum <br /> pressure test for the application as stated in Section 2.03 <br /> 3.02 ASTM D2310 Classifications (at 73.4-171 without leaking. <br /> Primary Pipe Secondary Pipe Only bonders that have successfully completed the <br /> 2"-3` RTRP-11AF 3" RTRP-11AF pressure test shall bond pipe and fittings. Each bonder shall <br /> carry a current, manufacturer proof of training card. <br /> 4" RTRP-11AH 4"-6" RTRP-11AH <br /> (Mechanical properties cell classifications shown are 4.02 Pipe Installation-Pipe shall be installed as specified <br /> minimums.) and Indicated on the drawings. <br /> The piping system shall be Installed in accordance with <br /> 3.03 Fittinas - All fittings shall be manufactured using the manufacturer's current published installation procedures. <br /> the same type of material as the pipe. Fittings may be <br /> manufactured either by compression molding, filament <br /> winding, resin transfer molding or contact molding methods. 03 Testing - A hydrostatic pressure test shall be <br /> con <br /> All fittings, adapter, and sump penetrations shall be UL971- conducted on the completed piping system. The piping <br /> 2004 Listed. system shall be subjected to 10 pressurization cycles from 0 <br /> psig to 1.5 times the design operating pressure as stated in <br /> Primary fittings shall be adhesive bonded, matched Section 2.03.c. After the 10 cycles,the pressure shall be held <br /> tapered bell and spigot and rated the same as the pipe. on the system for a minimum of 1 hour and the line Inspected <br /> Secondary containment fittings shall be two-piece style for leaks. <br /> to allow for 100%Inspection of the primary joint pressure test Test pressures shall not exceed 1.5 times the maximum <br /> and be rated to a minimum of 50 psig per UL 971-2004. rated pressure of the lowest rated element in the system. <br /> Should hydrostatic testing be Impractical, testing with <br /> low pressure air or Inert gas may be acceptable. Extreme All pipe joints shall be water tight. All joints that are found <br /> caution should be used when testing with air. Follow all to leak, by observation or during testing shall be replaced by <br /> safety precautions and testing recommendations of the pipe the contractor and retested. <br /> manufacturer. <br /> Should hydrostatic testing be impractical, testing with <br /> 3.04 Connections - Connections to flex connectors or low pressure air or Inert gas may be acceptable. Extreme <br /> other piping materials shall be made by the use of NPT caution should be used when testing with air. Follow all <br /> (National Pipe Thread) threaded adapters or flanges bonded safety precautions and testing recommendations of the pipe <br /> to the FRP piping system. manufacturer. <br /> 3.05 Sump Penetrations - Sump penetrations shall be <br /> made by means of a permanently bonded FRP coupling. The <br /> coupling shall be capable of adjusting for the slope of the <br /> piping system entering or exiting the sump wall. <br />
The URL can be used to link to this page
Your browser does not support the video tag.