My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1490
>
2300 - Underground Storage Tank Program
>
PR0541436
>
INSTALL 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 1:59:23 PM
Creation date
11/8/2018 9:40:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2018
RECORD_ID
PR0541436
PE
2351
FACILITY_ID
FA0023750
FACILITY_NAME
AGS FUEL INC DBA CIRCLE K CHEVRON
STREET_NUMBER
1490
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
1490 S MAIN ST
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\M\MAIN\1490\PR0541436\2018 INSTALL.PDF
QuestysFileName
2018 INSTALL
QuestysRecordDate
5/2/2018 6:57:48 PM
QuestysRecordID
3878462
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
501
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Installation Manual and Operating <br /> Guidelines for Fiberglass Underground <br /> Storage Tanks <br /> READ BEFORE INSTALLING TANK • Preparing the Tank for Pressure Testing.................. 16-17 <br /> • Pressurizing the PrimaryTank..............................17 <br /> Read all instructions,supplemental materials • Pressurizing the Interstitial Space in a DryTank...............17 <br /> and operating guidelines before installation. • Soaping the Tank.................................... 17-18 <br /> • Performing Visual Checks onaTank <br /> Compliance with the installation instructions and operating with Wet Interstitial Space ................................18 <br /> guidelines contained in this Installation Manual and Operating • Releasing Pressure From the Tank..........................18 <br /> Guidelines(subsequently referred to as the Installation Manual)are nec- • Testing for Specific Types of Pressu re-Testable Tanks.......18-20 <br /> essary forthe proper installation,maintenance and use of ourtanks and • Pressure-Testing Sidebar..................................19 <br /> accessories.For proper installation of some tanks and accessories,it may 5: Installing Tanks ....................... 20-23 <br /> also be necessary to consult select supplemental materials referenced in • General ...............................................20 <br /> the Introduction. • Dry Hole Installation .................................20-21 <br /> Failure to comply will void ourobligations underthe applicable • Wet Hole Installation....................................22 <br /> limited warranty forthe tank(s)and could result in death,serious • Bottom Sumps and Fittings ..............................22 <br /> injury,property damage ortank failure. • Ballasting Tanks(Adding Liquid))......................22-23 <br /> To Installer 6: Postinstallation Testing.................... 23 <br /> Before installation,read and understand the Installation Manual and • Pressure Testing Tanks...................................23 <br /> any applicable supplemental materials.Aftertank installation,deliver • Optional Hydrostatic Testing..............................23 <br /> the Installation Manual with the completed Tank Installation Checklist 7: Piping,Venting and Containment Sumps... 23-25 <br /> (Appendix E)to the tank owner. • Internal Piping.........................................23 <br /> To Owner • External Piping.........................................23 <br /> After installation,retain the limited warranty,the Installation Manual • Venting Tanks..........................................23 <br /> and checklist for future reference and follow all operating guidelines in • Piping Sidebar.........................................24 <br /> the Installation Manual. • Venting Interstitial Spaces ...............................25 <br /> • Installing Containment Sumps ...........................25 <br /> 8: Completing Installation ................ 26-27 <br /> TABLE OF CONTENTS • Taking Diameter Measure N4.............................26 <br /> • Monitoring Tanks.......................................26 <br /> Glossary. . . . . . . . . . . .................. . . . . . . 02 • Monitoring Single-Wall Tanks ............................26 <br /> Introduction..... .. ...................... 03-04 • Monitoring Double-Wall Tanks............................26 <br /> • Use of Tank Data Charts..................................03 • Monitoring Double-Wall Tank With a Dry Interstitial Space ....26 <br /> • Supplemental Materials.................................04 • Monitoring Double-Wall Tank With a Wet Interstitial Space....26 <br /> • Limited Warranties......................................04 • Setting the Level of the Monitoring Fluid...............26-27 <br /> I: Planning for Installation ................. 04-14 9: Operating Guidelines .............. .... 27-28 <br /> • General ........... • General ...............................................27 <br /> ...........................04 . Temperature LimitsforStored Products and Materials........27 <br /> • Backfill Material and Geotextile.......................04-OS . Entering Tanks ......... <br /> • Excavation Requirements.............................05-14 .........................................27 <br /> • Filling Tanks(In General).................................28 <br /> 2: Handling and Storing Tanks.............. .14-15 • Filling UL-Labeled/ULC-LabeledTanks......................28 <br /> • General ...... ting a....Guiding <br /> .......................4-14 10: Document Review .............. ......... 28 <br /> • Unloading,Hoisting and Guiding Tanks................. 14-IS <br /> • Storing Tanks ...........................................15 • Installation Manual .....................................28 <br /> 3: Preinstallation Inspection and Testing ......IS-1 • Appendices............................................28 <br /> • General................................................16 Appendices BI-B4. ... . ............ ...... . 36-42 5 Appendices AI-A4. ....................... 29-35 <br /> • Inspecting the Tank......................................16 <br /> 4: Testing During Installation...............16-20 pp <br /> AppendixD.. . ... .. . .... ........ .... .. . .... 44 <br /> • Tanks Types.............................................16 Appendix E . ... . .. ... . ... ..... . ... . ... .. 45-47 <br /> • Press u re-Test Pretesti n g Proced u res ........................16 <br /> 04.01.18 ZCL XERXES <br />
The URL can be used to link to this page
Your browser does not support the video tag.