Laserfiche WebLink
24.Actual capacities shown will be reduced if an overfill-protection 1 • PLANNING <br /> device is installed inthetank. FOR INSTALLATION <br /> 25.Actual tank height maybe greater than that shown with actual <br /> tank diameterwhen certain accessories are installed on a tank. I.I.GENERAL <br /> 26. Load height during shipping mayvary due to tank placement I.I.I.This section of the Installation Manual contains information that <br /> on the shipping trailer. you need to consider before a tank is delivered so that you are prepared <br /> 27.When using Appendices B1,B2,133 and B4 for determining to proceed with installation.This includes,but is not limited to,equipment <br /> the weight of a multicompartmenttank,you mustselectthetank needed for installation,backfill material selection,excavation requirements, <br /> size in the chart given the total nominal capacity of all compartments. tank anchoring options,taking diameter measurements,and onsite <br /> Notethefollowing: testing requirements. <br /> • Single-wall(SW)tankswith flatbaffle(s)installed are not 1.1.2.The following lististobeused asaguide forequipment <br /> considered multicompartmenttanks.Refer toone-compartment recommended fortank installation: <br /> tank data forthesetanks. • excavation equipment capable of producing a level-bottom <br /> • Fordouble-wall(DW)tanks with a dryinterstice,use the DW Dry hole and placing backfill material at any point in the excavation <br /> Weightcolumn. • suitable lifting equipment capable of lifting and placing <br /> • For double-wall(DW)tanks with afactory-installedTRUCHEK' the tanks and associated tank anchors <br /> wet monitoring interstice,use the DW Wet Weight column. • spirit level <br /> • transit or grade level <br /> SUPPLEMENTAL MATERIALS • 50-foot[15-meter]tape measure <br /> • tamping rod(s) <br /> 28.Go tozcl.comtoview tank installation training videos. • pipe wrenches and appropriate pipejoint compound <br /> • a test manifold for each pressure-testable tank or <br /> 29.Supplemental materials,which may apply to specific installations compartment(reference Figure 4-1) <br /> and/or conditions,are available upon request from technical support . source of pressurized air capable of6psig[40kPa]orinert gas <br /> (eengsupport@zcl.com).Mostsup plementa lmate rIaIsareaIso avaiIable . soap and water solution(during freezing conditions, <br /> atzcl.com. a suitable solution such as windshield wiper fluid may <br /> 30.Among those materials available from technical support be added to the soap and water mixture) <br /> (eng.support@zcl.com)andatzcl.coInarethefol Iowing: • soft cloth,brush or hand-held pneumatic sprayer <br /> • Diesel Exhaust Fluid(DEF)Tank Installation Instructions • hand shovel <br /> • Double-Wall Containment Sump Installation Instructions • lifting sling(s) <br /> • Dry Interstitial Space Test • soil compacting equipment(if necessary) <br /> • Field Fiberglass Lay-Up Instructions for Containment Sumps 1.2.BACKFILLMATERIAL AND GEOTEXTILE <br /> • Flexible Dipstick Monitoring Instructions(Canada only) <br /> • Hook/Hook Anchor Straps Instructions(Canada only) 1.2.1.GENERAL <br /> • Large Bottom Sump Installation Instructions 1.2.1.I.Tanks shall beinstalled using select rounded stones orcrushed <br /> • Oil/Water Separator Operating and Maintenance Manual stones as primary backfill material.See section 1.2.2 for specifications <br /> • Preinstallation Testing Instructions for Water(Wastewater of primary backfill material and Appendix C. <br /> Tanks Factory-Equipped for Pressure Testing <br /> • TRUCHEK'Data Log and Testing Procedure 1.2.1.2.Alternatively,tanks shall be installed using primary backfill <br /> • Single-Wall Containment Sump Installation Instructions vertically up to at least 75 percent of the tank diameterand secondary <br /> for Flat-Sided Containment Sumps backfill above the primary backfill.See section 1.2.3 for specifications <br /> • Single-Wall Containment Sump Installation Instructions of secondary backfill and Split Backfill Instructions(Appendix D) <br /> for Round Containment Sumps for more information regarding this alternative. <br /> • Tri ple-WaIITankPreinstaIlationTesti ngInstructions(USonly) I.2.I.3.UsingbaMil Imaterial otherthanthat specified Inerewith out <br /> • Wate rtig In t Cove r G asket R e p I a ce m e nt I nstru ctio ns(US o n ly) p no r writte n a uth orizati o n from us wi I I void o u r A I igation s u nde r the <br /> applicable limited warranty. <br /> LIMITED WARRANTIES <br /> NOTICE <br /> Using other than specified backfill material could cause tank failure, <br /> 31.Our applicable limited warranty contains operating guidelines <br /> orcouldresultindamagetothetankand/orsurroundingproperty. <br /> and limitations that should be reviewed as applicable.Copies of our <br /> current limited warranties are found at zcl.com. 1.2.2. PRIMARY BACKFILL <br /> 1.2.2.1.Primary backfill material must meet the following specifications: <br /> • Material is to be clean,free-flowing,and free of dirt,sand,large rocks, <br /> roots,organic materials,debris,ice and snow. <br /> • Backfill material shall not be frozen or contain lumps of frozen <br /> material at anytime during placement and compaction. <br /> 04 INTRODUCTION/ I: PLANNING FOR INSTALLATION <br />