My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1490
>
2300 - Underground Storage Tank Program
>
PR0541436
>
INSTALL 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 1:59:23 PM
Creation date
11/8/2018 9:40:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2018
RECORD_ID
PR0541436
PE
2351
FACILITY_ID
FA0023750
FACILITY_NAME
AGS FUEL INC DBA CIRCLE K CHEVRON
STREET_NUMBER
1490
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
1490 S MAIN ST
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\M\MAIN\1490\PR0541436\2018 INSTALL.PDF
QuestysFileName
2018 INSTALL
QuestysRecordDate
5/2/2018 6:57:48 PM
QuestysRecordID
3878462
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
501
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.3.1.5.For additional requirements and specifications,consult all 1.3.2.6.The tank must not fall within the"shadow"of the 45-degree <br /> codesand regulations of governmental agencies.Seethe Introduction angle line drawn from the foundation's footing.See Figure 1-1.If the <br /> for additional information. tank would fall within this"shadow;'do one of the following to ensure <br /> 1.3.2.EXCAVATION AND TANK LOCATION that the tank does notfall within the"shadow": <br /> • move the tank awayfrom the existing building <br /> 1.3.2.I.Werecommend that the tank ownerseekthe advice • move the foundation of the building to be constructed away from the tank <br /> of a local foundation professional engineer to determine the proper • deepen the footing of the planned building's foundation <br /> placement of a tank excavation near any existing structu re(s). 1,3.3.DEPTH OF EXCAVATION <br /> NOTICE 1.3.3.1.Typically,the depth of the excavation is determined by: <br /> Improper placementof the excavation could result in damage . groundwater conditions <br /> to the tank and/or property damage. • traffic at the site <br /> 1.3.2.2.The tank owner and/or the owner's technical representative is • soft or uneven excavation base <br /> responsible for determining the proper placement of a tank excavation. • pipeline grade requirements and/or invert elevations <br /> 1.3.2.3.In general terms,the size of the excavation is determined by: • codes and regulations <br /> • the number of tanks to be installed 1.3.3.2.Groundwater must be considered if the level of water <br /> • the size of the tanks to be installed in the ground may rise above the bottom of the tank at anytime <br /> 1.3.2.4.The location of a tank can be affected by the location during the life of the tank. <br /> of nearby structures.When selecting a tank site,care must betaken 1.3.3.3.Traffic loads are considered to be loadings for highway <br /> to avoid undermining the foundations of existing structures or new vehicles up to H-20 or HS-20 as defined in the AASHTO Standard <br /> buildings to be constructed.See Figure 1.1. Specifications for Highway Bridges. <br /> • Ensure that downward forces from loads carried by the foundations 1.3.3.4.Excavations must allow for 12 inches[30 cm] <br /> and supports of nearby structures(constructed before or after tank of backfill between the bottom of the tank and the bottom <br /> installation)are not transmitted to the tanks. of the excavation or the top of the anchor slab(or any <br /> other stabilizing materials used). <br /> 1.3.3.5.If either an anchorslab or other stabilizing material is used, <br /> Footing allow additional depth in the excavation to accommodate their construction. <br /> 1.3.3.6.Typically,no additional depth of bedding is required <br /> for the use of a deadman anchoring system. <br /> IIIII IIII IIII=IIIII 1.3.4.DEPTH OF COVER <br /> IIII-IIII 1111111111A CAUTION <br /> Shadow of III = III—VIIIFFFI In both traffic and nontraffic installations,no truck or equipment <br /> 45°Angle VIII—VIII IIIII—VIII loads are allowed overthe tank until the backfill is at least at <br /> —VIII—IIII IIII=IIIII the depth of coverspecified in Table 1.1 or Table 1.2,whichever <br /> 11111 HIM_ —IIIII <br /> isapplicable.Failure to follow this caution could resultin minor <br /> _ or moderate injury,and/or damage to the tank. <br /> =IIIIIEd IIIII 1.3.4.1.We recommend that every site be thoroughly evaluated <br /> IIIII— =IIIII forthe potential of a rise in the local watertable or of trapped water <br /> = (a wet-hole condition).Sufficient overburden andlor an appropriate <br /> Tank anchoring system must be present to offset buoyancy of the tank <br /> in such conditions. <br /> NOTICE <br /> Failure to provide sufficient overburden and/or an appropriate <br /> anchoring system could cause tank failure,or could result <br /> in damage to the tank and/or surrounding property. <br /> 1.3.4.2.The tank owner or the owner's technical representative is <br /> responsible for determining sufficient overburden and/or appropriate <br /> 1.3.2.5.Typically,the way to check the placement of the tank anchoring system. <br /> in relationship to a nearby structure is to do the following: 1.3.4.3.The minimum depths of cover dimensions given here <br /> • determine the depth of burial needed forthe tank are importantto the successful installation of a tank.They may <br /> • locate the footing of the structure to be considered not be sufficient to counteract buoyancy in wet-hole conditions. <br /> • determine the line thatwould fall into the ground from <br /> a45-degree angle drawn downward from thecorner(s) 1.3.4.4.Additional depths of cover may be necessary due to safety <br /> of the footing of the foundation that is closestto the tank requirements or operational requirements by governmental agencies. <br /> 06 I: PLANNING FOR INSTALLATION <br />
The URL can be used to link to this page
Your browser does not support the video tag.