My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1490
>
2300 - Underground Storage Tank Program
>
PR0541436
>
INSTALL 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 1:59:23 PM
Creation date
11/8/2018 9:40:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2018
RECORD_ID
PR0541436
PE
2351
FACILITY_ID
FA0023750
FACILITY_NAME
AGS FUEL INC DBA CIRCLE K CHEVRON
STREET_NUMBER
1490
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
1490 S MAIN ST
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\M\MAIN\1490\PR0541436\2018 INSTALL.PDF
QuestysFileName
2018 INSTALL
QuestysRecordDate
5/2/2018 6:57:48 PM
QuestysRecordID
3878462
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
501
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.3.6.2.PREFERRED METHOD 1.3.7.ANCHORING TANKS <br /> 1.3.6.2.1.The preferred method is to install newtank(s)in a separate 1.3.7.1.GENERAL <br /> hole if space allows and/or if existing tank(s)must remain in service 1.3.7.1.1.The tank ownerorthe owner's technical representative <br /> during installation of the newtank(s).The preferred method is described <br /> here(see Figure 1-4): is responsible for determining an appropriate anchoring system. <br /> • install a new tank in a separate hole at least3 feet[90 cm] 1.3.7.1.2.We recommend that everysite be thoroughly <br /> from the original hole evaluated forthe potential of a rise in the local watertable <br /> • follow procedures outlined in the Installation Manual oroftrapped water(a wet-hole condition).Sufficient overburden <br /> • maintain the natural barrierof undisturbed soil between tanks andloran appropriate anchoring system mustbe presentto offset <br /> • seesection1.3.5forminimumspacing requirements between tanks buoyancyofthe tank in such conditions. <br /> • sufficientsoil must remain between the excavations so that NOTICE <br /> the backfill in the original excavation does not shift. Failureto provide sufficient overburden and/oran appropriate <br /> anchoring system could cause tank failure,or could result <br /> in damage to the tank and/or surrounding property. <br /> PREFERRED METHOD 1.3.7.2.ANCHOR STRAPS <br /> . . ... . .. .. .... . . .... .... .... .. <br /> 36" GENERAL <br /> 1.3.7.2.1.Only ouranchorstraps may be used when anchoring ourtank. <br /> We have the following anchor strap models: <br /> • D-ringlD-ring anchor straps <br /> • man-out-of-hole(MOH)straps <br /> • hook/hook anchor straps On Canada only) <br /> ALTERNATE METHOD NOTE: For information on the hook/hook anchor straps,refer <br /> to the Hook/Hook Anchor Straps Instructions supplement.See the <br /> Introduction for information on how to obtain this supplement. <br /> O see section <br /> Depending rn which type 1 anchor strap is being used, <br /> see section 1.3.7.2.7(D-ringlD-ring)or 1.3.7.2.9(MOH). <br /> 1.3.7.2.4.The locations for anchor straps on each tank are marked <br /> on the tank ribs by the arrowhead symbols N(on the tank itself on <br /> 4-foot-diameter tanks). <br /> 1.3.6.3.ALTERNATE METHOD 1.3.7.2.5.When straps are placed over ribs,make sure that <br /> the area between the straps and the ribs is free of rocks or debris. <br /> A WARNING <br /> Failuretoshoretanksifnecessarytokeep the existing tank(s) D-RING/D-RING ANCHOR STRAPS <br /> from moving could result in death c r serious injury. <br /> A CAUTION 1.3.7.2.6.Our D-ringlD-ring anchor straps are designed <br /> If any existing tank(s)should move during the installation of new foranchoringourtanks. <br /> tanks,they must be removed and reinstalled according to the tank 1.3.7.2.7.While in the tank hole,the ends of the D-ringlD-ring <br /> manufacturer's instructions.Failure to follow this caution could anchorstraps are connected to anchor points using hardware described <br /> result in minoror moderate injury. in section 1.3.7.3. <br /> 1.3.6.3.1.If the preferred method outlined above is not possible or <br /> practical,use the alternate method described hereto bury additional MAN-OUT-OF-HOLE(MOH)STRAPS <br /> tanks in the same installation hole(see Figure 1-4): <br /> • EmptyRemo existing surface <br /> faces to less than 114 of capacity. 1.3.7.2.8.The man-out-of-hole(MOH)straps system is designed for use <br /> • Remove the surface slab. <br /> • Enlarge the excavation for the new tanks,but leave as much in installations where water is in the excavation and/or where personnel <br /> backfill as possible around the existing tanks. may not enter the tank hole. <br /> • Install shoring,if necessary,to make sure that existing tanks 1.3.7.2.9.The MOH strap consists of two identical halves. <br /> do not move and that sufficient backfill remains around them. 1,3.7.2.10.The ends of the MOH anchor straps are connected directly <br /> • Follow the procedures and requirements for installing the tanks <br /> as outlined in this Installation Manual. <br /> • See section 1.2 for backfill requirements,and see section 1.3 <br /> forexcavation and spacing requirements. <br /> I: PLANNING FOR INSTALLATION 09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.