My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1490
>
2300 - Underground Storage Tank Program
>
PR0541436
>
INSTALL 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 1:59:23 PM
Creation date
11/8/2018 9:40:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2018
RECORD_ID
PR0541436
PE
2351
FACILITY_ID
FA0023750
FACILITY_NAME
AGS FUEL INC DBA CIRCLE K CHEVRON
STREET_NUMBER
1490
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
1490 S MAIN ST
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\M\MAIN\1490\PR0541436\2018 INSTALL.PDF
QuestysFileName
2018 INSTALL
QuestysRecordDate
5/2/2018 6:57:48 PM
QuestysRecordID
3878462
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
501
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
to anchor points,and the two strap halves are connected to each other 1.3.7.3.2.The particular configuration of hardware will be determined <br /> at the top of the tank.See Figure 1-5. by the contractor,the owner orthe owner's representative,but is to adhere <br /> 1.3.7.2.II.MOH anchorstrapsare tobeinstal Iedinthe following way: to the following: <br /> Anchoring hardware must be manufactured to industry standards <br /> Figure 1-5 and dimensions,and sized according to Table 1-3. <br /> • All exposed metal on the anchoring system must be coated <br /> IIIII= Load Binder Strap Tee IIIII—IIIII or galvanized to protect against corrosion. <br /> Assembly -IIIII If the hardware used is not provided by us,contact the hardware <br /> IIIII= IIIII=IIII <br /> manufadu rer or supplier for specific information on hardwareand its use. <br /> IIIII=IIIII II=IIIII <br /> IIII=II MOH IIIII IIIII Minimum Turnbuckle <br /> IIIII—IIIII Strap _ Tank Diameter(by Type) Minimum Wire <br /> IIIII— IIII Diameter Hook Jaw Eye Rope Diameter <br /> IIIII=IIIII -IIIII 4-fast 4" /z" K3�8" <br /> IIIII=11IIIII=IIIII <br /> — ea mangy'. — 6-foot 3/4" '/i' 11i 3/e" <br /> f P11 IN <br /> 8-foot 11/4" 3/4" a/a" '/z" <br /> • liftthe strap with the hook end down and the hook facing away from the tank <br /> • lower the hook end of the strap between the tank and the anchor 10-foot P/4" 3/4" 3/4" '/z" <br /> Point,andhook the strap to the anchor point <br /> 12-foot 11/4" 3/4" i 3/4" Yz" <br /> • put a washer and a blind nut(acorn nut)on one end of the threaded rod. <br /> • Feed the rod through the hole in the strap-end connector 1.3.7.3.3.When D-ring/D-ring straps are shipped and turnbuckles <br /> • put a washerand a nut on the other end of the threaded rod are ordered from us,we mayship extra hardware that may or may not <br /> • centerthe wear plate on the top center line of the marked ribs be necessary with alternate deadmen placement. <br /> • lowerthe threaded rod,washerand nut into the channel section 1.3.7.3.4.Locate the anchor points as shown in Figurel-band <br /> on the strap-end connector,taking care to place the washerand <br /> nut on the outside of the connector Table 1.4.Refer to dimensions in Table 1.4.Align(within a tolerance <br /> • hand-tighten the nuts of±1 inch)all anchor points. <br /> 1.3.7.2.12.Repeat the bulleted items in 1.3.7.2.12 for the second Figure 1-6 <br /> rod of the assembly. IIIII—IIIII ` I IIII <br /> 1.3.7.2.13.Afterthe two threaded rods are placed,tighten thethreaded III— IIII— <br /> rods,using a torque wrench to tighten to 25-30 foot-pounds,or unti l snug. —IIII <br /> 1.3.7.2.14.Repeat the bulleted items in 1.3.7.2.12 for each of the load <br /> binder assemblies. IIIII= III=IIIII <br /> 1.3.7.3.HARDWARE AND ANCHOR POINTS IIIII III IIIII—IIIII <br /> 1.3.7.3.I.When ouranchoringhardware isnotbeingused,theinstalling IIIII—IIIII B A <br /> contractor is responsible for providing hardware and anchor points IIII III — — 12 Dea man 0 — IIIII IIIII <br /> of sufficient size and strength for the tank being installed. <br /> Nominal Tank Diameter A:Strap Eye B:Alternate Dimension C:Strap Length D:Center ofTank <br /> To Anchor Point to Center of Deadmen <br /> 4-foot 10"[25 cm] i not rec <br /> commended 00–[254 cm] 31"[79cm] <br /> 6-foot 23"[58 cm] 145'[368cm]o43'[111 cm] <br /> 8-foot(Red Tank) 29"[ 4cm] 17"[43 cm] 181 [460 cm] 53'[135 cm] <br /> 8-foot(Green Tank) 30"[76 cm] 18"[46 cm] 195"[495 cm] 57"[145 cm] <br /> 10-foot(Red Tank) 38''[97cm] 26"[66cm] 236"[600 cm] 70"[178 cm] <br /> 10-foot(Green Tank) 39"[100 cm] 27"[69 cm] 236"[600 cm] 71"[180 cm] <br /> 12-foot 46"[117 cm] 34"[86 cm] 271"[688 cm] 88"[224 cm] <br /> 10 I: PLANNING FOR INSTALLATION <br />
The URL can be used to link to this page
Your browser does not support the video tag.