My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2013 - 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
3440
>
2300 - Underground Storage Tank Program
>
PR0231173
>
COMPLIANCE INFO 2013 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:18 PM
Creation date
11/8/2018 9:41:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013 - 2015
RECORD_ID
PR0231173
PE
2361
FACILITY_ID
FA0006423
FACILITY_NAME
CENTRAL GAS STOCKTON
STREET_NUMBER
3440
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
3440 E MAIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MAIN\3440\PR0231173\COMPLIANCE INFO 2013 - 2015.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
•��ivu uui uaaas •� �'T_ — N ��1 <br /> AUG 11 15 <br /> UNDERGROUND 5'1'UKAGr: 'DANK �Y�'� RONMEN _ <br /> DESIGNATED UST OPERATOR MONTHLY INSPECTION'l 'CjRT <br /> l i Facility Name: Inspection bate: July 28, 2015 <br /> UNITED GASOLINE <br /> Facility Address: City: STOCKTON <br /> 3440 E. MAIN ST. <br /> Name of Designated IJS1'Operator Conducting Inspection: JACOB A.WEAVER <br /> International Code Council Certification No.: 8338858-UC Expiration Date: 3/5/2017 <br /> Signat Phone: (559)688-2977 ext. <br /> N/A=Not Appticable <br /> Item MONITORING PANEL/ALARM HISTORY Yesl No I N/A <br /> I. Is the monitoring system powered on and in proper operating mode? <br /> 2. Is the monitoring system not currently showing any leak alarms? 0101 El <br /> 3. Is the Alarm History Reportllog for the previous month available,and has it been reviewed by the <br /> Designated UST tor? (Attach a copy o the alarm history report/logreportllog to this inspection orm.) <br /> 4. Has each alarm for the previous month been responded to appropriately? <br /> UST SYSTEM INSPECTION <br /> 5. Are tank-top containment sumps free of water,debris,and hazardous substance? Nate:1fdw answer to Item 4 was"Yea,"si6p <br /> to Item 6.Swaps when an damn has occwred in the paw month enar be aspected±f a qualtfmd serwoe tednnwian has nae revs x3ed to,and <br /> adtbrsm4 the amase of the alarm.Docaswrnrahon ver; a servx a shoatd be auached to this <br /> report <br /> Yes No Yes No <br /> Sump Location: Sump Location: <br /> Sump Location: ❑ I Sump Location: ❑ ❑ <br /> 6. Are spill buckets(containment structures)free of water,debris,and hazardous substance? <br /> Yes No N/AI Yes No N/A <br /> Tank 1 ID—87 1 M I Ej I Ej I Tank 4 ID— <br /> Tank 2 ID—89 Tank 5 ID— ED <br /> ®_ <br /> k Tank 3 ID—91re Tank 6 ID— ❑ <br /> 7. Aunder-di containment areas free of water,debris,and hazardous substance? <br /> Yes No N/A Yes No N/A <br /> D' —1/2 ® D' —9/10 El <br /> Dispenser—3/4 ❑ Dispenser—11/12 El <br /> Dis —5/6 ❑ Dispenser-13/14 f <br /> ElDis —7/11 ® ❑ Dispenser—15/16 <br /> 8. Leak detection is property located within under-dispenser containment. <br /> Yes I No I N/A Yes I No N/A <br /> D' ism—12 0 Dis —9/10 ❑ <br /> D' —3/4 D' —11/12 ❑ <br /> D' —5/6 0 1 M I El Dispenser—13/14 ❑ <br /> I Dispensq—7/8 ® I El I ❑ D' —15/16 ❑ I ❑ <br /> l M <br /> Y PAPERWORK INSPECTION Yes No N/A Date Done <br /> If 9. Monitoring System Certification was completed within the past 12 months? 6/29/2015 <br /> 10. Line Leak Detectors were tested/certmed within the past 12 months? ® 6/29/2015 <br /> 1 1. Spill bucket(containment structure)testing completed within the past 12 months? 6/29/2015 <br /> 12. Line ti mess testin com leted within the time frame? ❑ <br /> 13. Seton containment tests com leted within the uired time frame? ❑ <br /> 14. Enhanced Leak Detection completed within the required time frame? ❑ ❑ <br /> 15. Other testis maintenance was co leted within aired time frame? (List test/maintenance items below. <br /> Describe Test/Maintenance:A.P.C.D. I El <br /> Describe Test/Maintenance:V/L'S ❑ <br /> FACIIdTY EMPLOYEE TRAINING I Yes FNoj N/A <br /> 16. Have allEfacji�i#yto ees received thereuired on-the-'ob trainin within the t ear? <br /> 17 Have allity employees hired within the 30 days received the on-the job ? ❑ <br />
The URL can be used to link to this page
Your browser does not support the video tag.