Laserfiche WebLink
D. Results of Testing/Servicing <br /> Software Version installed: 329.01 11 11 2 n 2016 <br /> Com lete the followin checklist: <br /> ® Yes ❑ No` Is the audible alarm operational? <br /> ® Yes ❑ No' Is the visual alarm operational? <br /> ® <br /> Yes ❑ No' Were all sensors visually inspected.Functionally tested,and confirmed operetional? <br /> ® Yes ❑ No' Were all sensors installed at lowest point of secentlary containment and positioned Mde <br /> other equipment will not intertere wtth Neir properoperation?❑ Yes ❑ No' If alarms are relayed to a remote monitoring station,is all communications equipment otlem)operational?N/AVes ❑ No' For pressurized piping systems,tloes the turbine automatically shut down if the pipinary containment monitoring system detects a leak,❑ N/q (ails to operate, or is electrically disconnected? ti yes: which sensors initiate posit-down? (Check all that apply) ® Sump/frenchSensors; ❑Dispenser Containment Sensors.Did you confirm positive shut-down due to leaks and sensor failureldisconnection? ® No.Yes ❑ No- For tank systems that utilize the monitoring system as the primary tank overall warnice(i.e., no mechanical overall prevention valve isN/A installed),is the overfill warning alarm visible and audible at the tank fill poinl(s)andg properly? If so,at what percent of tank capacitytloes the alarm tagger?Yes ® No Was any monitoring equipment replaced? tF yes,identify specific sensors,probes,oquipment replaced and list me manufacturer name <br /> and model for all replacement parts in Section E,below. <br /> ❑Ves' ® No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑Product; ❑Water. If yes,describe causes in Section E,below. <br /> ® Yes ❑ No' Was monitonng system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> ® Yes ❑ No. <br /> Is "monitoring equipment operational per manufacturer's specifications? <br /> In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> Monitoring System Certification Page 2 of 4 2/21/07 <br />