Laserfiche WebLink
F. )n-Tank Gauging/SIR Equipment: v <br /> ® Check this box if tank gd�g is used only for inXr `- <br /> ❑ Check this box if no tank gauging or SIR equiyfhe ory-' nlr M <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. JULComplete the following checklist: JU2 0 2016 <br /> ❑ Yes ❑ No" Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑ <br /> Yes ❑ No' Were all tank gauging probes visually inspected for damage and residue buildup? _ <br /> ❑ Yes ❑ No" Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No" Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No' Were all probes reinstalled properly? <br /> ❑ Yes ❑ No" ­_all items on the equipment manufacturers maintenance checklist completed? <br /> "In Section H,below,describe how and when these deficiencies were or will be corrects . <br /> Line Leak Detectors(LLD): ❑ Check this box if LLDs are not installed. <br /> Complete thefollowin checklist: <br /> KYesFEIN/A For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check all that apply) <br /> Simulated leak rate: ®3 g.p.h.; ❑0.1 g.p.h ❑0.2 g.p.hWere all LLDs confirmed operational and accurate within regulatory requirements? <br /> Was the testing apparatus properly calibrated? <br /> For mechanical LLDs,tloes the LLD restrict product flow if it detects a leak? <br /> For electronic LLDs,tloes the turbine automatically shut off if the LLD detects a leak? <br /> ❑ Yes ❑ No' For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br /> ® N/A <br /> ❑ <br /> Yes ❑ No" For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> ® N/A <br /> •❑ Yes ❑ No" For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ® N/A <br /> Ves ❑ <br /> No. <br /> Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Monitoring System Certification Page 3 of 4 2/21/07 <br />