Laserfiche WebLink
SWRCB,January 2002 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum ®Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used:0—15 PSI GAUGES Equipment Resolution:0.002" <br /> Piping Run#T-1 87 Piping Run#T-2 91 Diesel Piping Run#T-3 Pi ping Run# <br /> Piping Material: Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: A.O.Smith A.O.Smith A.O.Smith <br /> Piping Diameter: 3"over 2" 3" over 2" 3"over 2" <br /> Length of Piping Run: Approx. 175' Approx. 175' Approx. 175' <br /> Product Stored: 87 unleaded 91 supreme Diesel#2 <br /> Method and location of Test Boot @ STP Test Boot @ STP Test Boot @ STP <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 10 min 10 min 10 min <br /> starting test: <br /> Test Start Time: 9:30am 9:30am 9:30am <br /> Initial Reading(RI): 5.0 PSI 5.0 PSI 5.0 PSI <br /> Test End Time: 10:30am 10:30am 10:30am <br /> Final Reading(RF): 5.0 PSI 5.0 PSI 5.0 PSI <br /> Test Duration: 1 hr 1 hr 1 hr <br /> Change in Reading(RF-RI): 0.0 PSI 0.0 PSI 0.0 PSI <br /> Pass/Fail Threshold or NO LOSS NO LOSS NO LOSS NO LOSS <br /> Criteria: <br /> Test Result: ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail ❑ Pass ❑ Fail <br /> Comments—(include information on repairs made prior to testing and recommended follow-up for failed tests) <br />