Laserfiche WebLink
SWRCB,January 2002 <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑ Sump Manufacturer ® Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑ Pressure ❑Vacuum ® Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: INCON SUMP TESTER Equipment Resolution:0.002" <br /> Sump#T-1 87 Sump#T-2 91 Sump#T-3 Diesel Sump# <br /> Sump Diameter: <br /> 42" 42" 42" <br /> Sump Depth: <br /> 59" 58" 53" <br /> Sump Material: Fiberglass Fiberglass Fiberglass <br /> Height from Tank Top to Top of 11„ 16" 16" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 17„ 26" 26" <br /> ENV! <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry Dry Dry <br /> Portion of Sump Tested' 2"/Penetrations 2"/Penetration 2"/Penetrations <br /> Does turbine shut down when DNA <br /> sump sensor detects liquid(both ❑Yes ❑No ®NA ❑Yes ❑No ®NA ❑Yes ❑No ®NA ❑Yes ❑No <br /> product and water)?* <br /> Turbine shutdown response time N/A N/A NIA <br /> Is system programmed for fail-safe ❑Yes ❑No ®NA ❑Yes ❑No ®NA ❑Yes ❑No ®NA ❑Yes ❑No [:INA <br /> shutdown?* <br /> Was fail-safe verified to be ❑yes ❑No ®NA [:]Yes ❑No ®NA ❑Yes ❑No ®NA [:]Yes ❑No ❑NA <br /> o erational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 10 min 10 min 10 min <br /> test: <br /> Test Start Time: 12:12pm 12:12pm 12:33pm <br /> Initial Reading(R,): 6.1221" 5.6567" 6.0325" <br /> Test End Time: 12:27pm 12:27pm 12:48pm <br /> Final Reading(RF): 6.1219" 5.6560" 6.0326" <br /> Test Duration: 15min 15min 15min <br /> Change in Reading(RF-Rj): -0.0002" -0.0007" +0.0001" <br /> Pass/Fail Threshold or Criteria: +/-0.002" +/-0.002" +/-0.002" +l-0.002" <br /> Test Result: ® Pass ❑Fail ® Pass ❑ Fail ®Pass ❑Fail ❑Pass ❑Fail <br /> Was sensor removed for testing? <br /> Eyes ❑No ❑NA ®Yes ❑No ❑NA Eyes ❑No ❑NA [:]Yes ❑No ❑NA <br /> Was sensor properly replaced and Eyes ❑No ❑NA Eyes ❑No [INA ®Yes ❑No [:INA ❑Yes ❑No ❑NA <br /> verified functional after testing?. <br /> Comments (include inormation on repairs made prior to testing and recommended follow-up for failed tests) <br /> ABOVE IS THE LAST OF TWO BACK TO BACK 15 MINUTE TESTS <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to a�of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />